Final assembly line Airbus A330 in Mobile (Alabama - USA)
US$200 MILLION - 60,000 mē

Project owner: AIRBUS S.A.S.
Nature of the operation: Final assembly line on the site of the Brookley Field airport in Mobile
Mission: Feasibility study - Concept & preliminary design in US standards - Consultations in Design-Build - Assistance to project owner
Completion deadline: 2007 - 2011 - Project suspended
 
   
Fokker 100 painting room in Lelystat (Netherlands)
€5.1 MILLION
Project owner: QAPS - STTS
Architect: CREB
Nature of the operation: Construction of a painting room for Fokker 100, Embraer 190, Avro
Mission: Design, Project manager of technical and structure lots, Definition of specific air treatment, Tender management for D&B package, Scheduling Piloting Coordination, Works supervision, Definition and equipment of tooling
Completion deadline: 2009 - 2010
  Architect: CREB
   
Al Ain composite aerostructure manufacturing plant (United Arab Emirates)
Phase 1 : 23,000 m² (total : 33,000 m²) - Site area 150,000 m²

Project owner: MUBADALA
Nature of the operation: Installation of a plant specializing in the production of composite components for the aerospace industry. The initial phase of the project includes the construction of buildings covering more than 60,000 m², with 4,000 m² clean rooms.
Mission: Definition of the programme, support in bids for tenders for the buildings, infrastructures and utilities (civil engineering, outdoor development, VC, electricity, fluids), general project management, review and validation of design and construction studies, Scheduling, Piloting, Coordination
Completion deadline: Phase 1: 2008 - 2010
High Technology Building - Project delivered turnkey in 14 months
 
   
Long Range aircraft painting hall in Toulouse - Blagnac (31)
€21.7 MILLION

Project owner: STTS (partner of Airbus)
Architect: CREB
Nature of the operation: Construction of an A350 painting hall, compatible with A380, on the Aéroconstellation ZAC
Mission: Engineering all building trades - Team assignee - Works supervision - OPC - IPE - Synthesis
Completion deadline: 2008 - 2010
  Architect: CREB
   
SNECMA Factory (SAFRAN Group) in Évry Corbeil (91)
€40 MILLION - 130,000 m²

Project owner: SNECMA ETABLISSEMENT D'EVRY CORBEIL
Architect: MAAST Architects
Nature of the operation: Time assistance assignment for the drawing up of the site at modernisation master plan: analysis and diagnosis of existing elements, feasibility study, strategic planning, drawing up of calls for tender
Mission: Assignments as the Prime contractor for the exterior, a workshop of 88,000 m² and a building of 15,000 m²; assignment assisting the Prime contractor for buildings of 3,500 m² and 3,700 m²
Completion deadline: 2006 - 2008
  Architect: MAAST
   
Airbus A380 Assembly Factory in Toulouse - Blagnac (31)
€427 MILLION - 200,000 m²

Project owner: AIRBUS FRANCE - EADS
Architects: CARDETE & HUET - ADPi
Nature of the operation: Construction of experimentation buildings, assembly, logistics, and tertiary buildings for the industrial assembly and testing of the Airbus A380 - Associated infrastructure works: taxiways, networks
Mission: Agent of the prime contractor - General technical prime contracting - Specific prime contracting
Completion deadline: 2001 - 2005
  Architects: CARDETE & HUET - ADPi
   
AIRBUS "All programmes" Delivery Center in Toulouse - Saurous (31)
€30 MILLION - 30 ha - Car park 550 spaces

Project owner: AIRBUS FRANCE
Architect: Jacques FERRIER
Nature of the operation: Construction of buildings and equipment regrouping the functions linked to delivery of planes to clients, for all the models assembled at Toulouse
Mission: General management of the project - Technical studies of buildings, infrastructures and energies
Completion deadline:
2005 - 2007
  Architect: Jacques FERRIER
   
Iron Bird ground static testing centre - Saint Martin Site in Toulouse (31)
€50.3 MILLION

Project owner: AIRBUS FRANCE
Nature of the operation: New ground static test centre
Mission: Master plan studies, choice of a solution, implementation of the solution chosen
Completion deadline: 2000
 
   
Feasibility of the Airbus A350 final assembly line on the Toulouse - Saint-Martin site (31)
Project owner: AIRBUS FRANCE
Nature of the operation: Final assembly line of the A350 plane
Mission: Prime contractor for the entire operation - Feasibility study and specifications

Completion deadline : 2005 - 2006
 
   
Hangar 6 in Abu Dhabi (United Arab Emirates)
40,000 mē

Project owner: ABU DHABI AIRCRAFT TECHNOLOGIES (Mabadalar)
Nature of the operation: New aeronautics heavy maintenance hangar
Mission: Project Manager
Completion deadline: 2008 - 2010
 
   
Lyon Saint Exupéry Airport in Satolas (69)
€78.1 MILLION
Project owner: CHAMBRE DE COMMERCE ET D'INDUSTRIE DE LYON (CCIL)
Architects: CURTELIN - RICARD - BERGERET and SBT
Nature of the operation: Extension and redevelopment of Terminal T2
Mission: Project management and prime contracting for technical and structural contracts
Completion deadline:

- 1992 / 2000          €38.1 MILLION
- 2000 / 2004          €40 MILLION
  Architects: CURTELIN - RICARD - BERGERET and SBT
   
Lyon Saint Exupéry Airport in Satolas (69) - Central building
€5.2 MILLION
Project owner: CHAMBRE DE COMMERCE ET D'INDUSTRIE DE LYON (CCIL)
Architects: HTVS and CURTELIN - RICARD - BERGERET
Nature of the operation: Upgrading and renovation of the central building - Creation of a shopping mall
Mission: Project management
Completion deadline: 1999 - 2002
  Architects: HTVS and CURTELIN - RICARD - BERGERET
   
Control tower - Strasbourg Entzheim Airport (67)
4,200 m²

Project owner: Direction de l'Aviation Civile Nord-Est - Direction Départementale de l'Équipement du Bas Rhin
Architect: Luc ARSENE-HENRY
Associated architect: Alain TRAUD
Nature of the operation: Construction of the control tower (height: 35 m) and of the technical center which include all technical and running equipements devoted to air traffic control and airport runways management (3,000,000 Pax)
Mission: Services for deconstruction, overall coordination, design and construction engineering
Completion deadline: 2006 - 2009
  Architect: Luc ARSENE-HENRY
   

Emirates Airlines Maintenance Centre in Dubaï (United Arab Emirates)
Buildings 300,000 m² - Aeronautic areas and roads 200.000 mē

Project owner: EMIRATES AIRLINES
Architect: ADPi
Nature of the operation: Construction of the Emirates Airlines maintenance centre in Dubaï, with a view to hosting the A380s of the company -
Logistics billing, stores, training centre, offices, car park, technical utilities and power complex, mosque
Mission: Design studies for all technical contracts - fluids

Completion deadline: 2002 - 2005

  Architects: Delpeuch & Davy
   
Aircraft parking - Air France A380 Maintenance Base in Roissy Charles-de-Gaulle (95)
Project owner: AIR FRANCE SG.TZ
Nature of the operation: Creation of access to the maintenance hangar and an outside maintenance area with the setting up of nocturnal signals and ground markings (Phase 1) - Redevelopment of the existing cleaning area - Enlargement and modification of access in order to enable the passage of the A380, including ground markings (Phase 2)
Mission: Design, general prime contracting, and OPC (Phase 1) - Full prime contracting of works (Phase 2)
Completion deadline:
- 2005 - 2007 (Phase 1)
- 2007 - 2009 (Phase 2)
 
   
Air France Cargo - Freight station in Roissy Charles-de-Gaulle (95)
€12 MILLION - 100,000 mē

Project owner: AIR FRANCE CARGO
Architect: J.F. SCHMIDT
Nature of the operation: G1-XL freight station
Mission: Study, design and PMA of the extension of the G1-XL platform
Completion deadline: 2000 - 2004
  Architect: J.F. SCHMIDT
   