![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
![]() |
||
| Final
assembly line Airbus A330 in Mobile (Alabama - USA) US$200 MILLION - 60,000 mē Project owner: AIRBUS S.A.S. Nature of the operation: Final assembly line on the site of the Brookley Field airport in Mobile Mission: Feasibility study - Concept & preliminary design in US standards - Consultations in Design-Build - Assistance to project owner Completion deadline: 2007 - 2011 - Project suspended |
![]() |
|
| Fokker 100
painting room in Lelystat (Netherlands) €5.1 MILLION Project owner: QAPS - STTS Architect: CREB Nature of the operation: Construction of a painting room for Fokker 100, Embraer 190, Avro Mission: Design, Project manager of technical and structure lots, Definition of specific air treatment, Tender management for D&B package, Scheduling Piloting Coordination, Works supervision, Definition and equipment of tooling Completion deadline: 2009 - 2010 |
![]() |
|
| Al
Ain composite aerostructure manufacturing plant (United Arab Emirates) Phase 1 : 23,000 m² (total : 33,000 m²) - Site area 150,000 m² Project owner: MUBADALA Nature of the operation: Installation of a plant specializing in the production of composite components for the aerospace industry. The initial phase of the project includes the construction of buildings covering more than 60,000 m², with 4,000 m² clean rooms. Mission: Definition of the programme, support in bids for tenders for the buildings, infrastructures and utilities (civil engineering, outdoor development, VC, electricity, fluids), general project management, review and validation of design and construction studies, Scheduling, Piloting, Coordination Completion deadline: Phase 1: 2008 - 2010 High Technology Building - Project delivered turnkey in 14 months |
![]() |
|
| Long
Range aircraft painting hall in Toulouse - Blagnac (31) €21.7 MILLION Project owner: STTS (partner of Airbus) Architect: CREB Nature of the operation: Construction of an A350 painting hall, compatible with A380, on the Aéroconstellation ZAC Mission: Engineering all building trades - Team assignee - Works supervision - OPC - IPE - Synthesis Completion deadline: 2008 - 2010 |
![]() |
|
| SNECMA
Factory (SAFRAN Group) in Évry Corbeil (91) €40 MILLION - 130,000 m² Project owner: SNECMA ETABLISSEMENT D'EVRY CORBEIL Architect: MAAST Architects Nature of the operation: Time assistance assignment for the drawing up of the site at modernisation master plan: analysis and diagnosis of existing elements, feasibility study, strategic planning, drawing up of calls for tender Mission: Assignments as the Prime contractor for the exterior, a workshop of 88,000 m² and a building of 15,000 m²; assignment assisting the Prime contractor for buildings of 3,500 m² and 3,700 m² Completion deadline: 2006 - 2008 |
![]() |
|
| Airbus
A380 Assembly Factory in Toulouse - Blagnac (31) €427 MILLION - 200,000 m² Project owner: AIRBUS FRANCE - EADS Architects: CARDETE & HUET - ADPi Nature of the operation: Construction of experimentation buildings, assembly, logistics, and tertiary buildings for the industrial assembly and testing of the Airbus A380 - Associated infrastructure works: taxiways, networks Mission: Agent of the prime contractor - General technical prime contracting - Specific prime contracting Completion deadline: 2001 - 2005 |
![]() |
|
| AIRBUS
"All programmes" Delivery Center in Toulouse - Saurous (31) €30 MILLION - 30 ha - Car park 550 spaces Project owner: AIRBUS FRANCE Architect: Jacques FERRIER Nature of the operation: Construction of buildings and equipment regrouping the functions linked to delivery of planes to clients, for all the models assembled at Toulouse Mission: General management of the project - Technical studies of buildings, infrastructures and energies Completion deadline: 2005 - 2007 |
![]() |
|
| Iron
Bird ground static testing centre - Saint Martin Site in Toulouse (31) €50.3 MILLION Project owner: AIRBUS FRANCE Nature of the operation: New ground static test centre Mission: Master plan studies, choice of a solution, implementation of the solution chosen Completion deadline: 2000 |
![]() |
|
| Feasibility
of the Airbus A350 final assembly line on the Toulouse - Saint-Martin site
(31) Project owner: AIRBUS FRANCE Nature of the operation: Final assembly line of the A350 plane Mission: Prime contractor for the entire operation - Feasibility study and specifications Completion deadline : 2005 - 2006 |
![]() |
|
| Hangar 6
in Abu Dhabi (United Arab Emirates) 40,000 mē Project owner: ABU DHABI AIRCRAFT TECHNOLOGIES (Mabadalar) Nature of the operation: New aeronautics heavy maintenance hangar Mission: Project Manager Completion deadline: 2008 - 2010 |
![]() |
|
| Lyon
Saint Exupéry Airport in Satolas (69) €78.1 MILLION Project owner: CHAMBRE DE COMMERCE ET D'INDUSTRIE DE LYON (CCIL) Architects: CURTELIN - RICARD - BERGERET and SBT Nature of the operation: Extension and redevelopment of Terminal T2 Mission: Project management and prime contracting for technical and structural contracts Completion deadline: - 1992 / 2000 €38.1 MILLION - 2000 / 2004 €40 MILLION |
![]() |
|
| Lyon
Saint Exupéry Airport in Satolas (69) - Central building €5.2 MILLION Project owner: CHAMBRE DE COMMERCE ET D'INDUSTRIE DE LYON (CCIL) Architects: HTVS and CURTELIN - RICARD - BERGERET Nature of the operation: Upgrading and renovation of the central building - Creation of a shopping mall Mission: Project management Completion deadline: 1999 - 2002 |
![]() |
|
| Control
tower - Strasbourg Entzheim
Airport (67) 4,200 m² Project owner: Direction de l'Aviation Civile Nord-Est - Direction Départementale de l'Équipement du Bas Rhin Architect: Luc ARSENE-HENRY Associated architect: Alain TRAUD Nature of the operation: Construction of the control tower (height: 35 m) and of the technical center which include all technical and running equipements devoted to air traffic control and airport runways management (3,000,000 Pax) Mission: Services for deconstruction, overall coordination, design and construction engineering Completion deadline: 2006 - 2009 |
![]() |
|
|
Emirates
Airlines Maintenance Centre in Dubaï (United
Arab Emirates) |
![]() |
|
| Aircraft
parking - Air France A380 Maintenance Base in Roissy Charles-de-Gaulle (95) Project owner: AIR FRANCE SG.TZ Nature of the operation: Creation of access to the maintenance hangar and an outside maintenance area with the setting up of nocturnal signals and ground markings (Phase 1) - Redevelopment of the existing cleaning area - Enlargement and modification of access in order to enable the passage of the A380, including ground markings (Phase 2) Mission: Design, general prime contracting, and OPC (Phase 1) - Full prime contracting of works (Phase 2) Completion deadline: - 2005 - 2007 (Phase 1) - 2007 - 2009 (Phase 2) |
![]() |
|
| Air
France Cargo - Freight station in Roissy
Charles-de-Gaulle (95) €12 MILLION - 100,000 mē Project owner: AIR FRANCE CARGO Architect: J.F. SCHMIDT Nature of the operation: G1-XL freight station Mission: Study, design and PMA of the extension of the G1-XL platform Completion deadline: 2000 - 2004 |
![]() |
|
| Top
of page Return to the "Areas of expertise" page |