UFR / CSD joint project for the university hospital unit (CHU) in Clermont-Ferrand (63)
€15.2 MILLION- 9,900 m²

Project owner: RECTORAT DE L'ACADEMIE & CHU DE CLERMONT
Architect: Philippe GAZEAU
Nature of the operation: Joint construction of the Odontology Training and Research Unit and Dental Care Centre on the site of the Clermont-Ferrand CHU
Mission: Project management for structure engineering, roads, CVC, Fluids, High and low currents, Elevator devices, Fire safety prevention and coordination, Acoustics & energy savings, Synthetic management, Project waste environmental management
Completion deadline: 2009 - 2012
  Architect: Philippe GAZEAU
   
Losail Campus (Qatar)
210,000 mē

Project owner: QATAR FOUNDATION - Delegate project owner: QATAR PETROLEUM
Architect: Roger TAILLIBERT
Nature of the operation: Construction of the Academy of Excellency delivering an international bachelor's degree, including housing (residential school, allowance housing, and villas), sports fields, swimming pools, etc.
Mission: Engineering study, from sketch to market signing (bid for tender in EXE phase), Fluids engineering, Structure engineering, Electrical engineering, Savings of the engineering lots
Completion deadline: 2008 - 2010
  Architect: Roger TAILLIBERT
   
Jussieu University Campus in Paris (75)
€65 MILLION - 60,000 mē

Project owner: EPA JUSSIEU
Associated partners: Guy AUTRAN & Wladimir MITROFANOFF Architects / CASSO Sécurité / GLEEDS Economie
Nature of the operation:
- Design and construction of provisional buildings to be used for the duration of the site
- Asbestos removal, making safe, and rehabilitation of eight blocks of the library (Theory sector)
- Asbestos removal in five extra blocks (Geology sector)
Mission: Prime contractor for all building trades - Technip TPS agent of the MOE group - Management of works
Completion deadline: 1998 - 2005
  Architects: Guy AUTRAN and Wladimir MITROFANOFF
   
Kyoto High School in Poitiers (86)
€31.5 MILLION - 16,500 mē

Project owner: POITOU - CHARENTES REGION
Architect: SCAU (Guy AUTRAN & François GILLARD)
Nature of the operation: Construction of a professional high school - High Environmental Quality operation
Mission: Prime contractor for structural and technical contracts
Completion deadline: 2006 - 2009
  Architects: SCAU (Guy AUTRAN - François GILLARD)
   
Fonsorbes High School (31)
€14.9 MILLION - 10,900 mē

Project owner: REGION MIDI-PYRENEES
Architects: SCAU (Guy AUTRAN & François GILLARD) and Pierre AZEMA
Mission: Prime contractor for structural and technical contracts
Completion deadline: 2005 - 2008
  Architects: SCAU - Guy AUTRAN - Pierre AZEMA
   
E.N.S.O.S.P. in Aix en Provence (13)
€29.7 MILLION - 27,000 mē

Project owner: E.N.S.O.S.P.
Architects: SCAU (Guy AUTRAN and François GILLARD) - ATELIER 9
Nature of the operation: Construction of the educational and administrative section of the National Institute of Firemen Officers: educational buildings, administrative buildings, sports buildings, accommodations, catering
Mission: Technical design and engineering project management with conception, realisation and follow up of the technical work realisation on new buildings (all the buildings except accommodations and catering)
Completion deadline: 2006 - 2009
  Architects: SCAU : Guy AUTRAN - François GILLARD - Bernard CABANNES
   
Making safe the Porte des Alpes Campus in Lyon (69)
€11 MILLION - 30,000 mē

Project owner: LYON 2 University
Architect: Michel TURBINE
Nature of the operation: Removal of equipment, asbestos removal, making safe, and complete redevelopment
Mission: Prime contractor for all building trades
Agent for the MOE team - Management of works
Completion deadline: 2002 - 2009
  Architect: Michel TURBINE
   
Nice Saint Jean d'Angely University (06)
€13.4 MILLION - 10,000 mē

Project owner: RECTORAT DE NICE
Architects: G. AUTRAN - BRANTE & VOLLENWEIDER - GOMIS & MACE
Nature of the operation: Construction of the Saint-Jean d'Angely University Centre that houses education in Psychology, 1st year Medicine, and Ontology
Mission: Prime contractor for technical contracts
Completion deadline: 1995 - 1997
  Architects: Guy AUTRAN - BRANTE & VOLLENWEIDER - GOMIS & MACE
   
Paris Dauphine University in Paris (75)
€7.7 MILLION - 7,000 mē

Project owner: REGION ILE-DE-FRANCE and VILLE DE PARIS
Architect: S. ANSPACH (A.C.H.R.)
Mission: Prime contractor all building trades for the extension of research rooms and classrooms with 3 amphitheatres
Completion deadline: 1992 - 1994
  Architect: S. ANSPACH (A.C.H.R.)
   
Vienne Polyvalent High School in Saint Romain en Gal (69)
€16 MILLION - 15,400 mē

Project owner: RHÔNE-ALPES REGION
Architect: Atelier d'Architecture Bernard PARIS
Nature of the operation: Heavy restructuring in an occupied environment of general classrooms, scientific and tertiary classrooms, administration, works accommodation, school rooms and CDI
Mission: Prime contractor for technical contracts (structures, fluids) and VRD
Completion deadline: 2005 - 2010
  Architect: Bernard PARIS
   
Paul Lapie High School in Courbevoie (92)
€9.5 MILLION - 12,000 mē

Project owner: CONSEIL REGIONAL D'ILE DE FRANCE
Architect: Pierre-Louis FALOCI
Nature of the operation: Rehabilitation and extension - Operation on an occupied site
Mission: Prime contractor for structural contracts, technical contracts and construction economics
Completion deadline: 1997 - 2005
  Architect: Pierre-Louis FALOCI
   
University residence- INSA Campus in Villeurbanne (69)
€13.8 MILLION - 17,200 mē

Project owner: OPAC DU RHÔNE
Architect: A.A.B.D. (Dumétier)
Nature of the operation: Asbestos removal, restructuration and rehabilitation of 364 student apartments and construction of 128 student apartments (939 beds)
Mission: Prime contractor for design and completion of technical contracts and asbestos removal - Basic assignment
Completion deadline: 2004 - 2008
  Architect: A.A.B.D. (Dumétier)
   
Saint-Nazaire d'Aude College (11)
€8.4 MILLION - 4,700 mē

Project owner: CONSEIL GENERAL DE L'AUDE
Architect: LCR Architectures
Nature of the operation: Construction of the 27th college in the Aude: college (4,700 m²), gymnasium (1,672 m²), accommodation (260 m²)
Mission: Prime contractor for all building trades - Basic assignment + Execution studies
Completion deadline: 2004 - 2006
  Architect: LCR Architectures
   
Henri Poincaré High School in Palaiseau (91)
€8.4 MILLION - 9,000 mē
Project owner: CONSEIL REGIONAL D'ILE DE FRANCE
Architects: Catherine MORGOULIS, Cabinet LMT Architects
Nature of the operation: Heavy rehabilitation all building trades and extension of a secondary school of 830 pupils, including catering facilities
Mission: Engineer assignment all building trades including economics
Completion deadline: 2000 - 2004
  Architects: Catherine MORGOULIS and LMT Architects
   
Maryse Bastié College in Décines (69)
€4.57 MILLION

Project owner: CONSEIL GENERAL DU RHÔNE
Architect: Laurent BANSAC
Mission: Prime contractor for structural and technical contracts - Basic assignment + EXE studies
Completion deadline: 2000 - 2002
  Architect: Laurent BANSAC
   
CUST: Engineering school in Clermont-Ferrand (63)
€9.2 MILLION - 10,800 mē

Project owner: CONSEIL GENERAL DU PUY DE DÔME
CA: SOCIETE D'EQUIPEMENT DE L'AUVERGNE (SEAU)
Architect: PANTHEON
Nature of the operation: Extension of the Centre Universitaire des Sciences et des Techniques (CUST) and construction of a common centre with the Institut Supérieur de l'Informatique (ISIMA) on the Campus of CEZEAUX: Laboratories, classrooms for practical works, amphitheatres, communal rooms
Mission: Engineering assignment all building trades, project economics - EXE studies all building trades
Completion deadline: 1997 - 2000
  Architect: PANTHEON
   