Mixed tramway maintenance centre in Dijon (21)
€35 MILLION -
12 ha
Project owner: GRAND DIJON
Architect: FERRAND SIGAL
Nature of the operation: Construction and renovation (late 19th century building) of a mixed maintenance centre for maintaining and storing tramway rolling stock, and the fleet of public transport buses of Greater Dijon
HQE® targets: acoustic comfort, visual comfort, energy management, thermal comfort (SHW solar arrays), low nuisance worksite, hydrothermal comfort
Mission: Technical and structure project manager, management of interfaces, synthesis cell management, determination of operating and maintenance costs
Completion deadline: 2009 - 2012
  Architect: FERRAND SIGAL
   
TGV maintenance centre in Lyon Guillotière (69)
€66 MILLION -
60,000 m²
Project owner: SNCF
Architect: AREP
Nature of the operation: Construction of the set of buildings of the TGV maintenance centre (60 trains) on existing rail footprints, road works and networks next to the site
Mission: Technical assistance to the SNCF PM
Completion deadline: 2007 - 2008
  Architect: AREP
   
Tramway between Villejuif and Juvisy - Maintenance and storage centre in Vitry Sur Seine (94)
€14 MILLION -
25,800 m²
Project owner: REGIE AUTONOME DES TRANSPORTS PARISIENS (RATP)
Architect: FERRAND SIGAL
Nature of the operation: Construction of the maintenance and storage centre - Maintenance depot - Storage depot - Maintenance workshops - Service and cleaning station - Administrative buildings
Mission: All technical building trades engineering, technical coordination for the management of interfaces, summary, project economics
Completion deadline: 2006 - 2008
  Architect: FERRAND SIGAL
   
Marseille Tramway Depot (13)
€16 MILLION -
47,000 m² site coverage - 30,000 m² building coverage
Project owner: COMMUNAUTE URBAINE DE MARSEILLE PROVENCE METROPOLE
Architect: CCD Architecture - Marseille
Nature of the operation: Tramway workshop depot - Office area, storage area, workshop area
Mission: Study phases, basic MOP law, technical and structural contracts, walled and covered contracts, DRC contracts
Completion deadline: 2004 - 2006
  Architect: CCD Architecture
   
TGV East Maintenance Workshops in Ourcq (93)
27,000 m²

Project owner: SNCF
Joint contractor: SEMALY
Nature of the operation: Construction of the EITMM (Etablissement Industriel de Maintenance de Matériels) enabling maintenance of TGV East coaches
Mission: Management of construction and
assistance with acceptance operations (AOR)
Completion deadline: 2004 - 2005
 
   
LEA (Line East Agglomeration) in Lyon (69)
€12 MILLION - 7,200 m² - €2.2 MILLION for
extension
Project owner: SYTRAL
Architect: FERRAND SIGAL
Nature of the operation: Construction of storage depot, maintenance depot, maintenance workshop, administrative buildings - Extension
Mission: Prime contractor for technical, structural, walled/covered, and economics contracts - Structural, thermal, environmental, and electrical contracts (partial production of electricity via photovoltaic panels: approximately 1,000 m²)
Completion deadline:
2002 - 2005 and 2006 - 2007
  Architect: FERRAND SIGAL
   
Mixed bus/tramway depot of Strasbourg (67)
€20.6 MILLION - 12,000 mē

Project owner: C.T.S. (COMPAGNIE DE TRANSPORTS STRASBOURGEOIS)
Architect: FERRAND SIGAL
Nature of the operation: Construction of a mixed bus/tramway depot in KIBITZENAU
Mission: Basic mission + synthesis on electricity, CVC, plumbing, specific equipment (gantries, goarl dispensing station, CNV dispensing station - natural gas and town gas, brakemeter, oil dispensing and changing)
Completion deadline: 2003 - 2006
  Architect: FERRAND SIGAL
   
Depot for the 3rd Grenoble tramway line in Gières (38)
€21.6 MILLION - 28,300 mē

Project owner: SYNDICAT MIXTE DES TRANSPORTS EN COMMUN DE L'AGGLOMERATION GRENOBLOISE
Architect: FERRAND SIGAL
Nature of the operation: Storage depot (65 coaches) - Maintenance depot - Maintenance workshops - Administrative buildings with kitchen (150 covers) - Cleaning station - Guardhouse
Mission: All technical building trades engineering + economics + summary
Completion deadline:
2001 - 2006
  Architect: FERRAND SIGAL
   
Lyon Tramway Depot - Saint-Priest Workshops (69)
€21.95 MILLION - 19,200 mē

Project owner: SYTRAL
Prime contractor: SEMALY
Architect: FERRAND SIGAL
Nature of the operation: Construction of depot, workshops, rooms necessary for operation, and associated infrastructure works on a site covering 4 ha
Mission: Engineering of technical, structural, and walled/covered contracts
Completion deadline: 1997 - 2000
  Architect: FERRAND SIGAL
   
Technical Equipment in the Subway in Paris (75)
€7.7 MILLION

Project owner: RATP - ESE DEPARTMENT
Nature of the operation: Replacement of fans and sound-absorbing devices in lines and tunnels installation of centralized controls in liaison with ventilation stations
Mission: Technical assistance to Project leadership
Completion deadline : 2000 - 2002
 
   
"Brégaillon" bus depot in La Seyne Sur Mer (83)
€18.2 MILLION - 8,100 mē

Project owner: TPM (Urban community) Toulon Provence Méditerranée
Architect: BBG
Nature of the operation: Construction of a bus workshop-depot with an operating building
Mission: Engineering project management of the external works, structure, electricity and fluids works, completed by specific missions
Completion deadline: 2007 - 2010
  Architect: BBG
   
Intermodal exchange centre in Roanne (42)
Project owner: GROUPEMENT DE COMMANDES VILLE DE ROANNE / CONSEIL GENERAL DE LA LOIRE
Architect: Babylone
Nature of the operation: Creation of a road station, reception building, parking lot, gangway, reorganization of the station parvis
Mission: Project management all building trades and PMA on operating cost - Supply of the computer data exchange system e-GID® (documentary)
Completion deadline: 2004 - 2008
  Architect: Babylone
   
Abbeville toll station - A16 (80)
Project owner: SANEF
Architect: Manuelle GAUTRAND
Nature of the operation: Construction of the toll station of the A16 motorway in Abbeville
Mission: MOP law engineering - Thermal engineering and electrical engineering
Completion deadline: 1994 - 1996
  Architect: Manuelle GAUTRAND
   
Workshop of the tramway depot of Brest (29)
€14 MILLION -
6,469 m²
Project owner: BREST METROPOLE OCEANE
Architects: FERRAND SIGAL and AUA (Archipole Urbanisme et Architecture)
Nature of the operation: Construction of the depot workshop of the first tramway line in the Brest area
Mission: Technical, structure project management
Completion deadline: 2007 - 2010
  Architects: FERRAND SIGAL and AUA
   
Fittings and equipment in the Lyon metro (69)
€3 MILLION

Project owner: SYTRAL
Nature of the operation: Implementing lifts - A/C of the central control station - Organisation of the line agent offices
Mission: Project management in occupied site
Completion deadline: 1999 - 2001
 
   