| Mixed
tramway maintenance centre in
Dijon (21) €35 MILLION - 12 ha Project owner: GRAND DIJON Architect: FERRAND SIGAL Nature of the operation: Construction and renovation (late 19th century building) of a mixed maintenance centre for maintaining and storing tramway rolling stock, and the fleet of public transport buses of Greater Dijon HQE® targets: acoustic comfort, visual comfort, energy management, thermal comfort (SHW solar arrays), low nuisance worksite, hydrothermal comfort Mission: Technical and structure project manager, management of interfaces, synthesis cell management, determination of operating and maintenance costs Completion deadline: 2009 - 2012 |
![]() |
|
| TGV
maintenance centre in Lyon Guillotière (69) €66 MILLION - 60,000 m² Project owner: SNCF Architect: AREP Nature of the operation: Construction of the set of buildings of the TGV maintenance centre (60 trains) on existing rail footprints, road works and networks next to the site Mission: Technical assistance to the SNCF PM Completion deadline: 2007 - 2008 |
![]() |
|
| Tramway
between Villejuif and Juvisy - Maintenance and storage centre in
Vitry Sur Seine (94) €14 MILLION - 25,800 m² Project owner: REGIE AUTONOME DES TRANSPORTS PARISIENS (RATP) Architect: FERRAND SIGAL Nature of the operation: Construction of the maintenance and storage centre - Maintenance depot - Storage depot - Maintenance workshops - Service and cleaning station - Administrative buildings Mission: All technical building trades engineering, technical coordination for the management of interfaces, summary, project economics Completion deadline: 2006 - 2008 |
![]() |
|
|
Marseille Tramway Depot (13) €16 MILLION - 47,000 m² site coverage - 30,000 m² building coverage Project owner: COMMUNAUTE URBAINE DE MARSEILLE PROVENCE METROPOLE Architect: CCD Architecture - Marseille Nature of the operation: Tramway workshop depot - Office area, storage area, workshop area Mission: Study phases, basic MOP law, technical and structural contracts, walled and covered contracts, DRC contracts Completion deadline: 2004 - 2006 |
![]() |
|
| TGV
East Maintenance Workshops in Ourcq (93) 27,000 m² Project owner: SNCF Joint contractor: SEMALY Nature of the operation: Construction of the EITMM (Etablissement Industriel de Maintenance de Matériels) enabling maintenance of TGV East coaches Mission: Management of construction and assistance with acceptance operations (AOR) Completion deadline: 2004 - 2005 |
![]() |
|
| LEA
(Line East Agglomeration) in Lyon (69) €12 MILLION - 7,200 m² - €2.2 MILLION for extension Project owner: SYTRAL Architect: FERRAND SIGAL Nature of the operation: Construction of storage depot, maintenance depot, maintenance workshop, administrative buildings - Extension Mission: Prime contractor for technical, structural, walled/covered, and economics contracts - Structural, thermal, environmental, and electrical contracts (partial production of electricity via photovoltaic panels: approximately 1,000 m²) Completion deadline: 2002 - 2005 and 2006 - 2007 |
![]() |
|
| Mixed
bus/tramway depot of Strasbourg (67) €20.6 MILLION - 12,000 mē Project owner: C.T.S. (COMPAGNIE DE TRANSPORTS STRASBOURGEOIS) Architect: FERRAND SIGAL Nature of the operation: Construction of a mixed bus/tramway depot in KIBITZENAU Mission: Basic mission + synthesis on electricity, CVC, plumbing, specific equipment (gantries, goarl dispensing station, CNV dispensing station - natural gas and town gas, brakemeter, oil dispensing and changing) Completion deadline: 2003 - 2006 |
![]() |
|
| Depot
for the 3rd Grenoble tramway line in Gières (38) €21.6 MILLION - 28,300 mē Project owner: SYNDICAT MIXTE DES TRANSPORTS EN COMMUN DE L'AGGLOMERATION GRENOBLOISE Architect: FERRAND SIGAL Nature of the operation: Storage depot (65 coaches) - Maintenance depot - Maintenance workshops - Administrative buildings with kitchen (150 covers) - Cleaning station - Guardhouse Mission: All technical building trades engineering + economics + summary Completion deadline: 2001 - 2006 |
![]() |
|
| Lyon
Tramway Depot - Saint-Priest Workshops (69) €21.95 MILLION - 19,200 mē Project owner: SYTRAL Prime contractor: SEMALY Architect: FERRAND SIGAL Nature of the operation: Construction of depot, workshops, rooms necessary for operation, and associated infrastructure works on a site covering 4 ha Mission: Engineering of technical, structural, and walled/covered contracts Completion deadline: 1997 - 2000 |
![]() |
|
| Technical
Equipment in the Subway in Paris (75) €7.7 MILLION Project owner: RATP - ESE DEPARTMENT Nature of the operation: Replacement of fans and sound-absorbing devices in lines and tunnels installation of centralized controls in liaison with ventilation stations Mission: Technical assistance to Project leadership Completion deadline : 2000 - 2002 |
![]() |
|
| "Brégaillon"
bus depot in La
Seyne Sur Mer (83) €18.2 MILLION - 8,100 mē Project owner: TPM (Urban community) Toulon Provence Méditerranée Architect: BBG Nature of the operation: Construction of a bus workshop-depot with an operating building Mission: Engineering project management of the external works, structure, electricity and fluids works, completed by specific missions Completion deadline: 2007 - 2010 |
![]() |
|
| Intermodal
exchange centre in Roanne (42) Project owner: GROUPEMENT DE COMMANDES VILLE DE ROANNE / CONSEIL GENERAL DE LA LOIRE Architect: Babylone Nature of the operation: Creation of a road station, reception building, parking lot, gangway, reorganization of the station parvis Mission: Project management all building trades and PMA on operating cost - Supply of the computer data exchange system e-GID® (documentary) Completion deadline: 2004 - 2008 |
![]() |
|
| Abbeville
toll station - A16 (80) Project owner: SANEF Architect: Manuelle GAUTRAND Nature of the operation: Construction of the toll station of the A16 motorway in Abbeville Mission: MOP law engineering - Thermal engineering and electrical engineering Completion deadline: 1994 - 1996 |
![]() |
|
| Workshop
of the tramway depot of Brest (29) €14 MILLION - 6,469 m² Project owner: BREST METROPOLE OCEANE Architects: FERRAND SIGAL and AUA (Archipole Urbanisme et Architecture) Nature of the operation: Construction of the depot workshop of the first tramway line in the Brest area Mission: Technical, structure project management Completion deadline: 2007 - 2010 |
![]() |
|
| Fittings
and equipment in the Lyon metro (69) €3 MILLION Project owner: SYTRAL Nature of the operation: Implementing lifts - A/C of the central control station - Organisation of the line agent offices Mission: Project management in occupied site Completion deadline: 1999 - 2001 |
![]() |
|
| Top
of page Return to the "Areas of expertise" page |