![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
![]() |
||
| Al
Ain composite aerostructure manufacturing plant (United Arab Emirates) Phase 1 : 23,000 m² (total : 33,000 m²) - Site area 150,000 m² Project owner: MUBADALA Nature of the operation: Installation of a plant specializing in the production of composite components for the aerospace industry. The initial phase of the project includes the construction of buildings covering more than 60,000 m², with 4,000 m² clean rooms. Mission: Definition of the programme, support in bids for tenders for the buildings, infrastructures and utilities (civil engineering, outdoor development, VC, electricity, fluids), general project management, review and validation of design and construction studies, Scheduling, Piloting, Coordination Completion deadline: Phase 1: 2008 - 2010 High Technology Building - Project delivered turnkey in 14 months |
![]() |
|
| Renault
Nissan India box 2 in Chennaï (India) €300 MILLION - 750,000 m² - 400 ha site Project owner: RENAULT NISSAN Project Manager: Technip TPS Nature of the operation: Construction of an automotive assembly plant (180 vehicles/hour), supplier zone and administrative building Mission: Project management consultant, POA during the study and work phases Completion deadline: 2006 - 2009 |
![]() |
|
|
SNECMA
Factory (SAFRAN Group) in Évry Corbeil (91) |
![]() |
|
| Minatec
TOD Building in Grenoble (38) €15 MILLION - 2,000 mē Project owner: ELYO Architect: Atelier A Nature of the operation: Construction of a TOD building (Technical Operation Device) of the Minatec centre - Property designed for the production and distribution of different "process" energies and fluids Mission: Prime contractor for all technical building trades and process Completion deadline: 2003 - 2005 |
![]() |
|
| Vehicle
Test Centre - Renault Technocentre in Guyancourt (78) €16.8 MILLION - 18,000 mē Project owner: RENAULT SA Architect: Jacques FERRIER Nature of the operation: Construction of offices, workshops, metrology rooms, test benches for all vehicles using innovative fuel (LPG, GNV, hydrogen) Mission: Prime contractor for all technical building trades Completion deadline: 1995 - 1997 and 2004 |
![]() |
|
| Bosch
common rail injector line in Rodez (12) €4.7 MILLION - 2,280 mē Project owner: BOSCH FRANCE Nature of the operation: Creation of an assembly line under controlled dust environment Mission: Feasibility study, engineering all building trades, works supervision, OPC Completion deadline: 2007 - 2008 |
![]() |
|
| Renault
Factory in Sandouville (76) €22 MILLION - 16,000 mē Project owner: RENAULT SA Architects: Technip TPS and GCC Nature of the operation: Extension of the moulding building Mission: Concept-design mission, monitoring the drawing up of the Tender document for a Design-Construction contract - CA assignment for partial assignments of DET, OPC, APPROVAL and AOR - Use of the documentary module of e-GID® Completion deadline: 2005 - 2006 |
![]() |
|
| Gas
compression centre in Saint Clair Sur Epte (95) €6.11 MILLION - 2,729 mē Project owner: GAZ DE FRANCE - transport management Nature of the operation: Construction of 2 buildings, the one in administrative custom, the other one in workshops custom Mission: Prime contractor and management of works Completion deadline: 2006 - 2007 |
![]() |
|
| Test
buildings, Aubevoye Technical Centre (27) €15.2 MILLION - 15,000 mē Project owner: RENAULT SA Architect: Guy SONET Nature of the operation: Construction and restructuration of several buildings in the Aubevoye test centre Mission: Monitoring of works - Design and construction for all technical building trades - Engine tests: Prime contractor Completion deadline: 1993 - 1999 |
![]() |
|
| ALSTOM
Hydro France in Grenoble (38) €14 MILLION Project owner: ALSTOM Hydro France - Grenoble site Assignee engineering: Technip TPS Architect associated: Groupe 6 Nature of the operation: Part of an industrial area near the urban centre, the site is deployed over 15.5 ha and 80,000 m² floor The "Grenoble 2010" project consists in restructuring the industrial site of the HYDRO activity of the ALSTOM group. The site is dedicated to the design, construction, and fitting of hydroelectric energy production equipment. It hosts: - the worldwide technology centre of hydraulic turbines - different project activities (sales, management, turbine engineering, regulation and service activities) - production of hydraulic turbines - general activities (finance, human resources and quality) Mission: Technical and economic feasibility studies and decision assistance of the Project owner on the future intent of the buildings (optimisation, renovation, extension or demolition of existing buildings) Completion deadline: 2008 - 2010 |
![]() |
|
| Industrial
warehouses in Montbrison (42) €7.7 MILLION - 8,000 mē Project owner: BICHON Nature of the operation: "Turnkey" construction of industrial buildings, in several phases, designed for powder paint production, research, and training: - Production and packaging warehouse: 1,800 m² - Storage warehouse: 3,000 m² - Loading quays: 800 m² - Training centre: 1,500 m² Completion deadline: 1995 - 2000 |
![]() |
|
| CETIM
in Saint Etienne (42) €9.2 MILLION - 10,000 mē Project owner: CENTRE D'ETUDES TECHNIQUES DES INDUSTRIES MECANIQUES (CETIM) Architect: M. LASSAGNE Nature of the operation: Construction of a national mechanical test and experimentation centre including workshops and offices Mission: Prime contractor for all technical contracts Completion deadline: 1995 - 1996 |
![]() |
|
| Top
of page Return to the "Areas of expertise" page |