Al Ain composite aerostructure manufacturing plant (United Arab Emirates)
Phase 1 : 23,000 m² (total : 33,000 m²) - Site area 150,000 m²

Project owner: MUBADALA
Nature of the operation: Installation of a plant specializing in the production of composite components for the aerospace industry. The initial phase of the project includes the construction of buildings covering more than 60,000 m², with 4,000 m² clean rooms.
Mission: Definition of the programme, support in bids for tenders for the buildings, infrastructures and utilities (civil engineering, outdoor development, VC, electricity, fluids), general project management, review and validation of design and construction studies, Scheduling, Piloting, Coordination
Completion deadline: Phase 1: 2008 - 2010
High Technology Building - Project delivered turnkey in 14 months
 
   
Renault Nissan India box 2 in Chennaï (India)
€300 MILLION - 750,000 m² - 400 ha
site

Project owner: RENAULT NISSAN
Project Manager: Technip TPS
Nature of the operation: Construction of an automotive assembly plant (180 vehicles/hour), supplier zone and administrative building
Mission: Project management consultant, POA during the study and work phases
Completion deadline: 2006 - 2009
 
   

SNECMA Factory (SAFRAN Group) in Évry Corbeil (91)
€40 MILLION - 130,000 m²

Project owner: SNECMA ETABLISSEMENT D'EVRY CORBEIL
Architect: MAAST Architects
Nature of the operation: Time assistance assignment for the drawing up of the site at modernisation master plan: analysis and diagnosis of existing elements, feasibility study, strategic planning, drawing up of calls for tender
Mission: Assignments as the Prime contractor for the exterior, a workshop of 88,000 m² and a building of 15,000 m²; assignment assisting the Prime contractor for buildings of 3,500 m² and 3,700 m²
Completion deadline: 2006 - 2008

  Architect: MAAST Architects
   
Minatec TOD Building in Grenoble (38)
€15 MILLION - 2,000 mē

Project owner: ELYO
Architect: Atelier A
Nature of the operation: Construction of a TOD building (Technical Operation Device) of the Minatec centre - Property designed for the production and distribution of different "process" energies and fluids
Mission: Prime contractor for all technical building trades and process
Completion deadline: 2003 - 2005
  Architect: Atelier A
   
Vehicle Test Centre - Renault Technocentre in Guyancourt (78)
€16.8 MILLION - 18,000 mē

Project owner: RENAULT SA
Architect: Jacques FERRIER
Nature of the operation: Construction of offices, workshops, metrology rooms, test benches for all vehicles using innovative fuel (LPG, GNV, hydrogen)
Mission:
Prime contractor for all technical building trades
Completion deadline:
1995 - 1997 and 2004
  Architect: Jacques FERRIER
   
Bosch common rail injector line in Rodez (12)
€4.7 MILLION - 2,280 mē

Project owner: BOSCH FRANCE
Nature of the operation: Creation of an assembly line under controlled dust environment
Mission: Feasibility study, engineering all building trades, works supervision, OPC
Completion deadline: 2007 - 2008
 
   
Renault Factory in Sandouville (76)
€22 MILLION - 16,000 mē

Project owner: RENAULT SA
Architects: Technip TPS and GCC
Nature of the operation: Extension of the moulding building
Mission: Concept-design mission, monitoring the drawing up of the Tender document for a Design-Construction contract - CA assignment for partial assignments of DET, OPC, APPROVAL and AOR - Use of the documentary module of e-GID®
Completion deadline: 2005 - 2006
  Architects: Technip TPS and GCC
   
Gas compression centre in Saint Clair Sur Epte  (95)
€6.11 MILLION - 2,729 mē

Project owner: GAZ DE FRANCE - transport management
Nature of the operation: Construction of 2 buildings, the one in administrative custom, the other one in workshops custom
Mission: Prime contractor and management of works
Completion deadline:
2006 - 2007
  Architect: Philippe JAMMET
   
Test buildings, Aubevoye Technical Centre (27)
€15.2 MILLION - 15,000 mē

Project owner: RENAULT SA
Architect: Guy SONET
Nature of the operation: Construction and restructuration of several buildings in the Aubevoye test centre
Mission: Monitoring of works - Design and construction for all technical building trades - Engine tests: Prime contractor
Completion deadline: 1993 - 1999
  Architect: Guy SONET
   
ALSTOM Hydro France in Grenoble (38)
€14 MILLION

Project owner: ALSTOM Hydro France - Grenoble site
Assignee engineering: Technip TPS
Architect associated: Groupe 6
Nature of the operation: Part of an industrial area near the urban centre, the site is deployed over 15.5 ha and 80,000 m² floor
The "Grenoble 2010" project consists in restructuring the industrial site of the HYDRO activity of the ALSTOM group. The site is dedicated to the design, construction, and fitting of hydroelectric energy production equipment. It hosts:
- the worldwide technology centre of hydraulic turbines
- different project activities (sales, management, turbine engineering, regulation and service activities)
- production of hydraulic turbines
- general activities (finance, human resources and quality)
Mission: Technical and economic feasibility studies and decision assistance of the Project owner on the future intent of the buildings (optimisation, renovation, extension or demolition of existing buildings)
Completion deadline: 2008 - 2010
  Architect associated: Groupe 6
   
Industrial warehouses in Montbrison (42)
€7.7 MILLION - 8,000 mē

Project owner: BICHON
Nature of the operation: "Turnkey" construction of industrial buildings, in several phases, designed for powder paint production, research, and training:
- Production and packaging warehouse: 1,800 m²
- Storage warehouse: 3,000 m²
- Loading quays: 800 m²
- Training centre: 1,500 m²
Completion deadline: 1995 - 2000
 
   
CETIM in Saint Etienne (42)
€9.2 MILLION - 10,000 mē

Project owner: CENTRE D'ETUDES TECHNIQUES DES INDUSTRIES MECANIQUES (CETIM)
Architect: M. LASSAGNE
Nature of the operation: Construction of a national mechanical test and experimentation centre including workshops and offices
Mission: Prime contractor for all technical contracts
Completion deadline: 1995 - 1996
  Architect: M. LASSAGNE
   