CNRS - NEEL Institute in Grenoble (38)
€6.8 MILLION - 4,731 mē
Project owner: CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE (CNRS)
Architect: Philippe JAMMET
Nature of the operation: Construction of a new research building and extension-raising existing buildings to the benefit of the NEEL Institute located on the CNRS site of the Polygone Scientifique de Grenoble, this building hosts experimental projects dedicated to nanosciences. The technical facilities of the building were designed to guarantee extreme temperature stability (variation tolerated < 1 °C), extreme hygrometry stability (variation tolerated < 5 %), strict control of dust penetration (clean room class ISO 7) and strict control of vibration of the building (rigid chassis fitted on massive raft foundation independent from the ground floor building, and module based floating slab on the upper floor)
Mission: Light works closed roof engineering, Thermal engineering, Electrical engineering, Coordination piloting scheduling
Completion deadline: 2009 - 2011
  Architect: Philippe JAMMET
   

Integrated Platform (PFI) "Imageries du Vivant" (Life imaging) on the CNRS campus in Gif-sur-Yvette (91)
€6.8 MILLION - 3,800 mē

Project owner: CNRS (Centre National de la Recherche Scientifique)
Architect: Agence PARGADE
Nature of the operation: Creation of a technological building to host research laboratories, heavy experimental projects and analysis equipment, to pool and mutualise existing resources and support technological resources in Life sciences
Landscape integration - 4 scientific poles: Cellular biology, Structural and proteomic biology, Chemistry-Pharmacology and Functional genomics - Constraints related with vibration and the electromagnetic environment - Technical: laboratories with fume cupboards, special fluids
Mission: Technical project management for Roads, Structure, Technical lots, Laboratory fixtures (fume cupboards, lab tables...), fire safety
Completion deadline: 2009 - 2010

  Architect: PARGADE agency
   
INES (Institut National de l'Energie Solaire, National Institute for Solar Energy) in Chambéry (73)
€11.32 MILLION - 7,500 mē

Project owner: CONSEIL GENERAL DE LA SAVOIE
Architects: Michel REMON, Frédéric NICOLAS
Nature of the operation: New construction of a building grouping 3 platforms (research, development, industrial innovation) ; demonstration, training, awareness building, resource centre
Mission: Project and economic management of technical lots (structure and fluids)
Completion deadline: 2008 - 2010
  Architects: Michel REMON, Frédéric NICOLAS
   
Laboratoires pharmaceutiques Servier in Budapest (Hungary)
3,500 mē

Project owner: SERVIER
Architect: LUKACS ISTVAN
Nature of the operation: Research centre in pharmaceutical chemistry
Mission: Project owner assistant for defining needs, programming and supervising the works for all buildings - Project management mission on specific laboratory works
Completion deadline: 2006 - 2007
  Architect: LUKACS ISTVAN
   
Laboratoires Servier in Croissy (78)
€25 MILLION - 11,000 mē

Project owner: SERVIER
Architect: JAN LOSOWSKI
Nature of the operation: Extension of the existing R&D centre - Therapeutic and analytical chemistry laboratories - Zones for product banks, RMM, hydrogenisation
Mission: Technical project management for land depollution - Deconstruction of two older buildings present on the site (asbestos and lead) - OPC, fire safety
Completion deadline: 2006 - 2008
  Architect: JAN LOSOWSKI
   
Jussieu University Campus in Paris (75)
€65 MILLION - 60,000 mē

Project owner: EPA JUSSIEU
Associated partners: Guy AUTRAN & Wladimir MITROFANOFF Architects / CASSO Sécurité / GLEEDS Economie
Nature of the operation:
- Design and construction of provisional buildings to be used for the duration of the site
- Asbestos removal, making safe, and rehabilitation of eight blocks of the library (Theory sector)
- Asbestos removal in five extra blocks (Geology sector)
Mission: Prime contractor for all building trades - Technip TPS agent of the MOE group - Management of works
Completion deadline: 1998 - 2005
  Architects: Guy AUTRAN - Wladimir MITROFANOFF
 
DGCCRF-DGDDI Interregional Laboratory in Oullins (69)
€9.6 MILLION - 4,500 mē

Project owner:MINISTRY FOR THE ECONOMY AND FINANCES
Architect: Jacques FERRIER
Nature of the operation: Laboratory common to Customs management and Fraud Repression managementAgro-food and industrial analysis- Microbiological examinations, analysis of compositions- Contamination research- Tests on industrial products
Mision: Prime contractor for technical and all building trade contracts
Completion deadline: 1998 - 2002
  Architect: Jacques FERRIER
 
Institut Claude Bourgelat -National Veterinary School of Lyon in Marcy l'etoile (69)
€2.8 MILLION - 2,250 mē
Project owner: REGION RHÔNE-ALPES
Architect: FERRAND SIGAL
Nature of the operation: Construction of the future Compared Biopathology Regional Centre on the site of the National Veterinary School of Lyon
This research Institute shelters an animal centre (180 boxes), 3 surgical rooms and 10 laboratories
Part of the Institute is a level-2 containment area, with processing of liquid waste
Mission: Technical and structural engineering contracts
Completion deadline: 2003 - 2005
  Architect: FERRAND SIGAL
   
Research laboratories in Solaize (69)
€3 MILLION - 3,000 mē

Project owner: INSTITUT FRANÇAIS DU PETROLE (IFP)
Architect: ASYMPTOTE - Pierre SALMON
Nature of the operation: Construction of several buildings and laboratories, experimentation and research centre for petroleum products and their transformation
Mission: General prime contractor and construction as property manager
Completion deadline: 1995 - 2001
  Architect: ASYMPTOTE - Pierre SALMON
 
Collège de France in Paris (75)
€25.6 MILLION - 20,000 mē

Project owner: COLLEGE DE FRANCE and EPMOTC (CA)
Architect: Jacques FERRIER
Nature of the operation: Second phase of the heavy restructuring of the Collège de France
Upgrading and transformation of laboratories, test and experiment rooms, library and researchers offices
Mission: Technical engineering all building trades including fluids and laboratory equipment
Completion deadline: 2000 - 200
7
  Architect: Jacques FERRIER
 
Pfizer laboratory in Amboise (37)
€22.9 MILLION - 30,000 mē

Project owner: PFIZER FRANCE - Technip
Nature of the operation: Restructuration and extension of a pharmaceutical production and logistics centre
Mission: Assistance to Technip for covered walled area
Completion deadline: 1995 - 1998
 
   
Laboratory of the Paris National Mines School in Corbeil-Essonnes (91)
€6.7 MILLION - 7,000 mē - Prix de la Premičre Oeuvre 1993 (Construction Award)

Project owner: SNECMA and Ecole des Mines
Architects: Jacques FERRIER and François GRUSON
Nature of the operation: Research laboratories for material physics
Mission: Joint prime contractor for all of the technical contracts
Completion deadline: 1992
  Architects: Jacques FERRIER and François GRUSON
   