| CNRS
- NEEL
Institute in Grenoble (38) €6.8 MILLION - 4,731 mē Project owner: CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE (CNRS) Architect: Philippe JAMMET Nature of the operation: Construction of a new research building and extension-raising existing buildings to the benefit of the NEEL Institute located on the CNRS site of the Polygone Scientifique de Grenoble, this building hosts experimental projects dedicated to nanosciences. The technical facilities of the building were designed to guarantee extreme temperature stability (variation tolerated < 1 °C), extreme hygrometry stability (variation tolerated < 5 %), strict control of dust penetration (clean room class ISO 7) and strict control of vibration of the building (rigid chassis fitted on massive raft foundation independent from the ground floor building, and module based floating slab on the upper floor) Mission: Light works closed roof engineering, Thermal engineering, Electrical engineering, Coordination piloting scheduling Completion deadline: 2009 - 2011 |
![]() |
|
|
Integrated
Platform (PFI) "Imageries du Vivant" (Life imaging) on the CNRS
campus in Gif-sur-Yvette (91) |
![]() |
|
| INES
(Institut National de l'Energie Solaire, National Institute for Solar Energy)
in Chambéry (73) €11.32 MILLION - 7,500 mē Project owner: CONSEIL GENERAL DE LA SAVOIE Architects: Michel REMON, Frédéric NICOLAS Nature of the operation: New construction of a building grouping 3 platforms (research, development, industrial innovation) ; demonstration, training, awareness building, resource centre Mission: Project and economic management of technical lots (structure and fluids) Completion deadline: 2008 - 2010 |
![]() |
|
| Laboratoires
pharmaceutiques Servier in Budapest (Hungary) 3,500 mē Project owner: SERVIER Architect: LUKACS ISTVAN Nature of the operation: Research centre in pharmaceutical chemistry Mission: Project owner assistant for defining needs, programming and supervising the works for all buildings - Project management mission on specific laboratory works Completion deadline: 2006 - 2007 |
![]() |
|
| Laboratoires
Servier in Croissy (78) €25 MILLION - 11,000 mē Project owner: SERVIER Architect: JAN LOSOWSKI Nature of the operation: Extension of the existing R&D centre - Therapeutic and analytical chemistry laboratories - Zones for product banks, RMM, hydrogenisation Mission: Technical project management for land depollution - Deconstruction of two older buildings present on the site (asbestos and lead) - OPC, fire safety Completion deadline: 2006 - 2008 |
![]() |
|
|
Jussieu University Campus in Paris (75) €65 MILLION - 60,000 mē Project owner: EPA JUSSIEU Associated partners: Guy AUTRAN & Wladimir MITROFANOFF Architects / CASSO Sécurité / GLEEDS Economie Nature of the operation: - Design and construction of provisional buildings to be used for the duration of the site - Asbestos removal, making safe, and rehabilitation of eight blocks of the library (Theory sector) - Asbestos removal in five extra blocks (Geology sector) Mission: Prime contractor for all building trades - Technip TPS agent of the MOE group - Management of works Completion deadline: 1998 - 2005 |
![]() |
|
| DGCCRF-DGDDI
Interregional Laboratory in Oullins (69) €9.6 MILLION - 4,500 mē Project owner:MINISTRY FOR THE ECONOMY AND FINANCES Architect: Jacques FERRIER Nature of the operation: Laboratory common to Customs management and Fraud Repression managementAgro-food and industrial analysis- Microbiological examinations, analysis of compositions- Contamination research- Tests on industrial products Mision: Prime contractor for technical and all building trade contracts Completion deadline: 1998 - 2002 |
![]() |
|
| Institut
Claude Bourgelat -National Veterinary School of Lyon in Marcy l'etoile (69) €2.8 MILLION - 2,250 mē Project owner: REGION RHÔNE-ALPES Architect: FERRAND SIGAL Nature of the operation: Construction of the future Compared Biopathology Regional Centre on the site of the National Veterinary School of Lyon This research Institute shelters an animal centre (180 boxes), 3 surgical rooms and 10 laboratories Part of the Institute is a level-2 containment area, with processing of liquid waste Mission: Technical and structural engineering contracts Completion deadline: 2003 - 2005 |
![]() |
|
| Research
laboratories in Solaize (69) €3 MILLION - 3,000 mē Project owner: INSTITUT FRANÇAIS DU PETROLE (IFP) Architect: ASYMPTOTE - Pierre SALMON Nature of the operation: Construction of several buildings and laboratories, experimentation and research centre for petroleum products and their transformation Mission: General prime contractor and construction as property manager Completion deadline: 1995 - 2001 |
![]() |
|
| Collège
de France in Paris (75) €25.6 MILLION - 20,000 mē Project owner: COLLEGE DE FRANCE and EPMOTC (CA) Architect: Jacques FERRIER Nature of the operation: Second phase of the heavy restructuring of the Collège de France Upgrading and transformation of laboratories, test and experiment rooms, library and researchers offices Mission: Technical engineering all building trades including fluids and laboratory equipment Completion deadline: 2000 - 2007 |
![]() |
|
| Pfizer
laboratory in Amboise (37) €22.9 MILLION - 30,000 mē Project owner: PFIZER FRANCE - Technip Nature of the operation: Restructuration and extension of a pharmaceutical production and logistics centre Mission: Assistance to Technip for covered walled area Completion deadline: 1995 - 1998 |
![]() |
|
| Laboratory
of the Paris National Mines School in Corbeil-Essonnes (91) €6.7 MILLION - 7,000 mē - Prix de la Premičre Oeuvre 1993 (Construction Award) Project owner: SNECMA and Ecole des Mines Architects: Jacques FERRIER and François GRUSON Nature of the operation: Research laboratories for material physics Mission: Joint prime contractor for all of the technical contracts Completion deadline: 1992 |
![]() |
|