![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
![]() |
||
| Hospital
Facility in Chambéry (73) Estimated €130 to 145 MILLION- New 60,000 m² - Deconstruction 50,000 mē Project owner: CHAMBERY HOSPITAL CENTRE (CENTRE HOSPITALIER DE CHAMBERY) In consultation Nature of the operation: Demolition of 50,000 m² in 3 phases in occupied site. Construction of 60,000 m² in 2 phases ; the first phase includes all full hospitalisation capacities in surgery and medicine for about 2/3 total surface ; the second includes all day hospital beds in medicine and surgery for about 1/3 total surface Mission: Project owner technical assistance (technical expertise, economic expertise, management and piloting of the construction designer, administrative and accounting management of the design construction market) Completion deadline: 2009 - 2016 |
![]() |
|
| Gerontology
Centre in Narbonne (11) €15 MILLION - SDO 10,122 m² - Land 18,000 mē Project owner: CENTRE HOSPITALIER DE NARBONNE Architects: SEQUENCES - FONTAINE-VALMY Nature of the operation: Construction of a gerontology centre with 174 beds, including 2 Alzheimer units with 12 beds and an outdoor parking lot with 102 spaces HQE® targets: integrated choices of construction processes and products, low environmental impact project, maintenance and operation, olfactive comfort, sanitary quality of spaces and air quality Mission: Project management for technical, structure and HQE®, structure engineering, thermal engineering, electrical engineering Completion deadline: 2009 - 2012 |
![]() |
|
| UFR
/ CSD joint project for the university hospital unit (CHU) in Clermont-Ferrand (63) €15.2 MILLION- 9,900 m² Project owner: RECTORAT DE L'ACADEMIE & CHU DE CLERMONT Architect: Philippe GAZEAU Nature of the operation: Joint construction of the Odontology Training and Research Unit and Dental Care Centre on the site of the Clermont-Ferrand CHU Mission: Project management for structure engineering, roads, CVC, Fluids, High and low currents, Elevator devices, Fire safety prevention and coordination, Acoustics & energy savings, Synthetic management, Project waste environmental management Completion deadline: 2009 - 2012 |
![]() |
|
| Purpan
Hospital in Toulouse (31) €150 MILLION - 81,000 mē Project owner: CENTRE HOSPITALIER UNIVERSITAIRE DE TOULOUSE Architects: SCAU (A. Zublena - B. Cabannes) Contracted architect - CARDETE & HUET Associated achitects Nature of the operation: Construction of a hospital of 550 beds and 27 operating rooms, made up of three medical centres, two medico-technical centres and a 400 space car park Mission: Prime contractor for technical contracts, management of works and computerised data exchange system of the project via Internet Completion deadline: 2006 - 2011 |
![]() |
|
| Beauperthuy
Hospital in Pointe Noire (Guadeloupe) €48 MILLION - 19,200 mē Project owner: CENTRE HOSPITALIER LOUIS DANIEL BEAUPERTHUY Architects: SCAU (Assignee) / ATELIER R Nature of the operation: Reconstruction and extension of the hospital facility Mission: Engineering of technical lots, technical lot savings, works supervision, economic management in project phase. Supply of the e-GID® IT data system (documentary) Completion deadline: 2007-2011 |
![]() |
|
| La
Croix Rousse Biology Laboratory in Lyon (69) €13 MILLION - 10,000 mē Project owner: HOSPICES CIVILS DE LYON Architect : Jean-Philippe PARGADE Project including laboratories classified NSB3 and NSB2 Nature of the assignment: Project leadership for technical trade sections, structure and project cost control Completion deadline: 1998 - 2004 |
![]() |
|
| Caremeau
Hospital in Nîmes (30) €74 MILLION - 65,000 mē Project owner: CENTRE HOSPITALIER UNIVERSITAIRE DE NÎMES Architect: ZUBLENA Nature of the assignment: Technical summary and plan cabinetRehabilitation and extension operation from 400 to 800 beds Completion deadline: 1996 - 2000 |
![]() |
|
| Jean
XXIII Medical House in Lille (59) €12.5 MILLION - 8,115 mē Project owner : SCI MAISON D'EGLISE / OIDR Architect: MAES Architectes Nature of the operation: Construction of the medical house, a house hosting the Communauté des Oblates de l'Eucharistie, and the church house Mission: Technical and structural project management Completion deadline: 2008 - 2010 |
![]() |
|
| Establishment
Hosting Dependent Elderly Persons in Mervans (71) €6.85 MILLION - 4,691 m² Project owner: CONSEIL GENERAL DE LA SAÔNE ET LOIRE Architect: TECTONIQUES Nature of the operation: Establishment hosting dependent elderly persons with 90 spaces Mission: Technical, structure, economic, and HQE® project management Completion deadline: 2007 - 2008 |
![]() |
|
| Hauteville
Care Facility in Paris (75) €10.8 MILLION - 6,000 mē Project owner: ETABLISSEMENT PUBLIC DE SANTE MAISON BLANCHE Architect: Thierry ROZE & Benoît CARRIE Nature of the operation: Rehabilitation of old accommodation and a listed private house with conservation of the façades and interior decorations into psychiatric care unit of 100 beds Mission: Prime contractor for structural, fluid and construction economics Completion deadline: 1999 - 2005 |
![]() |
|
| Energy
Diagnosis Edouard Herriot Hospital in Lyon (69) 153,000 mē Project owner: HOSPICES CIVILS DE LYON (HCL) Nature of the operation: Energy diagnosis covering the 150 buildings of the Edouard Herriot Hospital Mission: Prime contractor for TCE + economics Completion deadline: 2004 |
![]() |
|
| Upgrading
of the electrical power supply of 9 hospitals in Lyon (69)
€5 MILLION - 176,781 mē Project owner: HOSPICES CIVILS DE LYON (HCL) Nature of the operation: Upgrading of the electrical power supply of 9 hospitals in Lyon (HV, LV, electric generators) Sites in use Mission: Prime contractor for TCE Completion deadline: 2002 - 2004 |
![]() |
|
| Michallon
Hospital in Grenoble (38) €22.9 MILLION - 150,000 mē Project owner: CHU de GRENOBLE Nature of the operation: All building trades technical diagnosis Mission: Feasibility, master plan and pluriannual equipment plan with a view to renovating and upgrading the hospital Completion deadline: 1999 - 2002 |
![]() |
|
| Restructuration
and humanisation of Marrel Hospital in Rive de Gier (42) €4.6 MILLION - 7,500 mē Project owner: CENTRE HOSPITALIER DE RIVE DE GIER Architect: M. LASSAGNE Nature of the operation: Creation of a Rehabilitation Centre and of 40 beds with specialised technical platform: - Balneotherapy and hydrotherapy - Physiotherapy - Occupational therapyHumanisation of the main building: Internal medicine department 30 beds Completion deadline: 1995 - 2000 |
![]() |
|
| Top
of page Return to the "Areas of expertise" page |