Hospital Facility in Chambéry (73)
Estimated €130 to 145 MILLION- New 60,000 m² - Deconstruction 50,000 mē

Project owner: CHAMBERY HOSPITAL CENTRE (CENTRE HOSPITALIER DE CHAMBERY)
In consultation
Nature of the operation: Demolition of 50,000 m² in 3 phases in occupied site. Construction of 60,000 m² in 2 phases ; the first phase includes all full hospitalisation capacities in surgery and medicine for about 2/3 total surface ; the second includes all day hospital beds in medicine and surgery for about 1/3 total surface
Mission: Project owner technical assistance (technical expertise, economic expertise, management and piloting of the construction designer, administrative and accounting management of the design construction market)
Completion deadline: 2009 - 2016
 
   
Gerontology Centre in Narbonne (11)
€15 MILLION - SDO 10,122 m² - Land 18,000 mē

Project owner: CENTRE HOSPITALIER DE NARBONNE
Architects: SEQUENCES - FONTAINE-VALMY
Nature of the operation: Construction of a gerontology centre with 174 beds, including 2 Alzheimer units with 12 beds and an outdoor parking lot with 102 spaces
HQE® targets: integrated choices of construction processes and products, low environmental impact project, maintenance and operation, olfactive comfort, sanitary quality of spaces and air quality
Mission: Project management for technical, structure and HQE®, structure engineering, thermal engineering, electrical engineering
Completion deadline: 2009 - 2012
  Architects: Séquences - Fontaine-Malvy
   
UFR / CSD joint project for the university hospital unit (CHU) in Clermont-Ferrand (63)
€15.2 MILLION- 9,900 m²

Project owner: RECTORAT DE L'ACADEMIE & CHU DE CLERMONT
Architect: Philippe GAZEAU
Nature of the operation: Joint construction of the Odontology Training and Research Unit and Dental Care Centre on the site of the Clermont-Ferrand CHU
Mission: Project management for structure engineering, roads, CVC, Fluids, High and low currents, Elevator devices, Fire safety prevention and coordination, Acoustics & energy savings, Synthetic management, Project waste environmental management
Completion deadline: 2009 - 2012
  Architect: Philippe GAZEAU
   
Purpan Hospital in Toulouse (31)
€150 MILLION - 81,000 mē

Project owner: CENTRE HOSPITALIER UNIVERSITAIRE DE TOULOUSE
Architects: SCAU (A. Zublena - B. Cabannes) Contracted architect - CARDETE & HUET Associated achitects
Nature of the operation: Construction of a hospital of 550 beds and 27 operating rooms, made up of three medical centres, two medico-technical centres and a 400 space car park
Mission: Prime contractor for technical contracts, management of works and computerised data exchange system of the project via Internet
Completion deadline: 2006 - 2011
  Architects: SCAU (contracted architect) - CARDETE & HUET (associated architects)
   
Beauperthuy Hospital in Pointe Noire (Guadeloupe)
€48 MILLION - 19,200 mē

Project owner: CENTRE HOSPITALIER LOUIS DANIEL BEAUPERTHUY
Architects: SCAU (Assignee) / ATELIER R
Nature of the operation: Reconstruction and extension of the hospital facility
Mission: Engineering of technical lots, technical lot savings, works supervision, economic management in project phase. Supply of the e-GID® IT data system (documentary)
Completion deadline: 2007-2011
  Architects: SCAU (contracted architect) / ATELIER R
   
La Croix Rousse Biology Laboratory in Lyon (69)
€13 MILLION - 10,000 mē

Project owner: HOSPICES CIVILS DE LYON
Architect : Jean-Philippe PARGADE
Project including laboratories classified NSB3 and NSB2
Nature of the assignment: Project leadership for technical trade sections, structure and project cost control
Completion deadline: 1998 - 2004
  Architect: Jean-Philippe PARGADE
   
Caremeau Hospital in Nîmes (30)
€74 MILLION - 65,000 mē

Project owner: CENTRE HOSPITALIER UNIVERSITAIRE DE NÎMES
Architect: ZUBLENA
Nature of the assignment: Technical summary and plan cabinetRehabilitation and extension operation from 400 to 800 beds
Completion deadline: 1996 - 2000
  Architect: ZUBLENA
   
Jean XXIII Medical House in Lille (59)
€12.5 MILLION - 8,115 mē

Project owner : SCI MAISON D'EGLISE / OIDR
Architect: MAES Architectes
Nature of the operation: Construction of the medical house, a house hosting the Communauté des Oblates de l'Eucharistie, and the church house
Mission: Technical and structural project management
Completion deadline: 2008 - 2010
  Architect: MAES Architects
   
Establishment Hosting Dependent Elderly Persons in Mervans (71)
€6.85 MILLION - 4,691 m²

Project owner: CONSEIL GENERAL DE LA SAÔNE ET LOIRE
Architect: TECTONIQUES
Nature of the operation: Establishment hosting dependent elderly persons with 90 spaces
Mission: Technical, structure, economic, and HQE® project management
Completion deadline: 2007 - 2008
  Architect: TECTONIQUES
   
Hauteville Care Facility in Paris (75)
€10.8 MILLION - 6,000 mē

Project owner: ETABLISSEMENT PUBLIC DE SANTE MAISON BLANCHE
Architect: Thierry ROZE & Benoît CARRIE
Nature of the operation: Rehabilitation of old accommodation and a listed private house with conservation of the façades and interior decorations into psychiatric care unit of 100 beds
Mission: Prime contractor for structural, fluid and construction economics
Completion deadline: 1999 - 2005
  Architects: Thierry ROZE & Benoît CARRIE
   
Energy Diagnosis Edouard Herriot Hospital in Lyon (69)
153,000 mē

Project owner: HOSPICES CIVILS DE LYON (HCL)
Nature of the operation: Energy diagnosis covering the 150 buildings of the Edouard Herriot Hospital
Mission: Prime contractor for TCE + economics
Completion deadline: 2004
 
   
Upgrading of the electrical power supply of 9 hospitals in Lyon (69)
€5 MILLION
- 176,781 mē
Project owner: HOSPICES CIVILS DE LYON (HCL)
Nature of the operation: Upgrading of the electrical power supply of 9 hospitals in Lyon (HV, LV, electric generators)
Sites in use
Mission: Prime contractor for TCE
Completion deadline: 2002 - 2004
 
   
Michallon Hospital in Grenoble (38)
€22.9 MILLION - 150,000 mē

Project owner: CHU de GRENOBLE
Nature of the operation: All building trades technical diagnosis
Mission: Feasibility, master plan and pluriannual equipment plan with a view to renovating and upgrading the hospital
Completion deadline: 1999 - 2002
 
   
Restructuration and humanisation of Marrel Hospital in Rive de Gier (42)
€4.6 MILLION - 7,500 mē

Project owner: CENTRE HOSPITALIER DE RIVE DE GIER
Architect: M. LASSAGNE
Nature of the operation: Creation of a Rehabilitation Centre and of 40 beds with specialised technical platform:
- Balneotherapy and hydrotherapy
- Physiotherapy
- Occupational therapyHumanisation of the main building: Internal medicine department 30 beds
Completion deadline: 1995 - 2000
  Architect: M. LASSAGNE
   
Top of page
Return to the "Areas of expertise" page
   
[Home] [The company] [News] [Services & assignments] [Major projects] [Areas of expertise] [Contacts] [Careers and Opportunities] [e-GID] [Technip group]