Mining town in Imouraren (Niger)
€100 MILLION - 200,000 m²

Project owner: AREVA NIGER
Nature of the operation: Design and construction of a mining town (10,000 inhabitants)
Mission: Master plan and programming of the town, technical engineering (structure, roads, electricity, CVC), Worksite economics, Assistance to prior reception operations
Completion deadline: 2008 - 2012
  Architect: MAES agency
   
"Park and ride" at the "Les Argoulets" and "Balma Gramont" metro in Toulouse (31)
€8.7 MILLION - 12,600 m² (x2)
Project owner: SMTC Toulouse
Architects: Pierre AZEMA & Michel TURBINE
Nature of the operation: Construction of the two broad superstructure distributed parking lots with 450 spaces each, and development of neighbouring surfaces - Parking lots implemented in mixed metallic structure in G+3
Mission: Project management all building trades - Base mission MOP law
Completion deadline: 2006 - 2007
  Architects: Pierre AZEMA & Michel TURBINE
   
Underground car park of 450 spaces in Carcassonne (11)
€9.3 MILLION - 11,000 mē

Project owner: VILLE DE CARCASSONNE
Architect: Michel TURBINE
Nature of the operation: Programming for the construction of an underground car park of 450 spaces and the development of a square and the adjoining roads
Mission: Client assistance
Completion deadline: 2002
  Architect: Michel TURBINE
   
Renault Technocentre in Guyancourt (78)
150 ha

Project owner: RENAULT
Nature of the operation: The assignment covers all of the TECHNOCENTRE site (150 ha) and neighborhoods
Mission: Prime contracting for the Infrastructures and Utilities: overall management of implantations on the entire site - Buildings and service station equipment - Water treatment centre
Completion deadline:
1993 - 2001
 
   
Eurodisneyland Magic Kingdom in Marne La Vallée (77)
€91.5 MILLION - 120 ha

Project owner: EURO DISNEYLAND - Magic Kingdom Infrastructure
Nature of the operation: Construction of an European leisure center
Mission: Prime contractor for infrastructure works covering a surface area of 120 ha
Completion deadline: 1989 - 1992
 
   
Urban restructuring site Combarel in Rodez (12)
36,000 mē

Project owner: GRAND RODEZ
Architect: Bruno FORTIER / DROIT DE CITE
Nature of the operation: Redevelopment of site Combarel
Mission : Definition studies and preliminary design
Completion deadline : 2006
  Architect: Bruno FORTIER / DROIT DE CITE
   
Updating the master plans of the industrial zone of Fos Sur Mer (13)
3,600 ha

Project owner: PORT AUTONOME DE MARSEILLE
Architect: François KERN
Nature of the operation: Assistance to Project Owner for updating the master plans of the Marseille harbour in the metropolitan area
Mission: political, social and economic, urbanistic, and technical studies to determine the evolution of this geographical zone over a period of 20 years
Completion deadline: 2002
  Architect: François KERN
   
Development of the Capucins site in Brest (29)
12 ha

Project owner: COMMUNAUTE URBAINE DE BREST
Architect: Bruno FORTIER
Nature of the operation: Development of a site in Brest over 12 hectares located on the right bank of the river Penfeld, a site which will be transferred by the National Navy to the Urban Community of Brest to construct a new centre town quarter
Mission: Definition study
Completion deadline: 2004 - 2005
  Architect: Bruno FORTIER
   
Renovation of housing in the Sauvegarde, Duchère quarter, in Lyon (69)
€11 MILLION
Project owner: OPAC du Grand Lyon
Architect: Gautier - Conquet
Nature of the operation: Heavy renovation and residentialisation of the 420/430 buildings located in the quarter of La Duchère in Lyon - Demolition of the central parts to create 4 small buildings, reconstruction of new housing on gable, within the Larger City Project of residentialisation of the "Duchère" quarter, work performed in occupied site
Mission: Project management of the structure and fluid lots
Completion deadline: 2008 - 2010
  Architect: Gautier - Conquet
   
New City Hall quarter in Nice (06)
€133 MILLION
Project owner: VILLE DE NICE
Architect: Pierre-Louis FALOCI
Nature of the operation: Creating dynamics in an old quarter by creating a new City Hall (2,000 municipal employees), a high-capacity underground car park (1,500 places), a sports complex and a media library, the rehabilitation of the municipal plastic arts school, the restructuring of roads and the creation of a vast public area, incorporating the route of the first line of the tramway created simultaneously by the Metropolitan Council, and conserving the old Gare du Sud (building dating from the end of the 19th century)
Mission: Prime contractor for structural, technical, and DRC contracts
Completion deadline: 2003 - 2008
  Architect: Pierre-Louis FALOCI
   
Valmy Area ex-site GIAT in Roanne (42)
Land covering 110,000 mē - Buildings 80,000 mē

Project owner: GRAND ROANNE
Nature of the project: Development of an industrial area - Prime contractor for sanitation and drinking water networks, gas, fire, electricity, telecommunications, sewage water removal, rainwater (holding reservoir of 750 m3) - Infrastructures and development of the site - Creation of boulevard Valmy: 2 x 2 carriageways and a two-lane roundabout - Feasibility study and master plan for the creation of an industrial activity park
Mission: DRC prime contractor
Completion deadline: 1999 - 2001
 
   