![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
![]() |
||
| Mining
town in Imouraren (Niger) €100 MILLION - 200,000 m² Project owner: AREVA NIGER Nature of the operation: Design and construction of a mining town (10,000 inhabitants) Mission: Master plan and programming of the town, technical engineering (structure, roads, electricity, CVC), Worksite economics, Assistance to prior reception operations Completion deadline: 2008 - 2012 |
![]() |
|
| "Park
and ride" at the "Les Argoulets" and "Balma Gramont"
metro in Toulouse (31) €8.7 MILLION - 12,600 m² (x2) Project owner: SMTC Toulouse Architects: Pierre AZEMA & Michel TURBINE Nature of the operation: Construction of the two broad superstructure distributed parking lots with 450 spaces each, and development of neighbouring surfaces - Parking lots implemented in mixed metallic structure in G+3 Mission: Project management all building trades - Base mission MOP law Completion deadline: 2006 - 2007 |
![]() |
|
| Underground
car park of 450 spaces in Carcassonne (11) €9.3 MILLION - 11,000 mē Project owner: VILLE DE CARCASSONNE Architect: Michel TURBINE Nature of the operation: Programming for the construction of an underground car park of 450 spaces and the development of a square and the adjoining roads Mission: Client assistance Completion deadline: 2002 |
![]() |
|
| Renault
Technocentre
in Guyancourt (78) 150 ha Project owner: RENAULT Nature of the operation: The assignment covers all of the TECHNOCENTRE site (150 ha) and neighborhoods Mission: Prime contracting for the Infrastructures and Utilities: overall management of implantations on the entire site - Buildings and service station equipment - Water treatment centre Completion deadline: 1993 - 2001 |
![]() |
|
| Eurodisneyland
Magic Kingdom in Marne La Vallée (77) €91.5 MILLION - 120 ha Project owner: EURO DISNEYLAND - Magic Kingdom Infrastructure Nature of the operation: Construction of an European leisure center Mission: Prime contractor for infrastructure works covering a surface area of 120 ha Completion deadline: 1989 - 1992 |
![]() |
|
| Urban
restructuring site
Combarel in Rodez (12) 36,000 mē Project owner: GRAND RODEZ Architect: Bruno FORTIER / DROIT DE CITE Nature of the operation: Redevelopment of site Combarel Mission : Definition studies and preliminary design Completion deadline : 2006 |
![]() |
|
| Updating
the master plans of the industrial zone of
Fos Sur Mer (13) 3,600 ha Project owner: PORT AUTONOME DE MARSEILLE Architect: François KERN Nature of the operation: Assistance to Project Owner for updating the master plans of the Marseille harbour in the metropolitan area Mission: political, social and economic, urbanistic, and technical studies to determine the evolution of this geographical zone over a period of 20 years Completion deadline: 2002 |
![]() |
|
| Development
of the Capucins site in Brest (29) 12 ha Project owner: COMMUNAUTE URBAINE DE BREST Architect: Bruno FORTIER Nature of the operation: Development of a site in Brest over 12 hectares located on the right bank of the river Penfeld, a site which will be transferred by the National Navy to the Urban Community of Brest to construct a new centre town quarter Mission: Definition study Completion deadline: 2004 - 2005 |
![]() |
|
| Renovation
of housing in the Sauvegarde, Duchère quarter, in Lyon (69) €11 MILLION Project owner: OPAC du Grand Lyon Architect: Gautier - Conquet Nature of the operation: Heavy renovation and residentialisation of the 420/430 buildings located in the quarter of La Duchère in Lyon - Demolition of the central parts to create 4 small buildings, reconstruction of new housing on gable, within the Larger City Project of residentialisation of the "Duchère" quarter, work performed in occupied site Mission: Project management of the structure and fluid lots Completion deadline: 2008 - 2010 |
![]() |
|
| New
City Hall quarter in Nice (06) €133 MILLION Project owner: VILLE DE NICE Architect: Pierre-Louis FALOCI Nature of the operation: Creating dynamics in an old quarter by creating a new City Hall (2,000 municipal employees), a high-capacity underground car park (1,500 places), a sports complex and a media library, the rehabilitation of the municipal plastic arts school, the restructuring of roads and the creation of a vast public area, incorporating the route of the first line of the tramway created simultaneously by the Metropolitan Council, and conserving the old Gare du Sud (building dating from the end of the 19th century) Mission: Prime contractor for structural, technical, and DRC contracts Completion deadline: 2003 - 2008 |
![]() |
|
| Valmy
Area ex-site GIAT in Roanne (42) Land covering 110,000 mē - Buildings 80,000 mē Project owner: GRAND ROANNE Nature of the project: Development of an industrial area - Prime contractor for sanitation and drinking water networks, gas, fire, electricity, telecommunications, sewage water removal, rainwater (holding reservoir of 750 m3) - Infrastructures and development of the site - Creation of boulevard Valmy: 2 x 2 carriageways and a two-lane roundabout - Feasibility study and master plan for the creation of an industrial activity park Mission: DRC prime contractor Completion deadline: 1999 - 2001 |
![]() |
|
| Top
of page Return to the "Areas of expertise" page |