![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
![]() |
|
||||||||||||
| The
project The project, called "Renault Nissan India Box 2", is the greenfield construction of a car assembly plant (dimensioned for total 180 vehicles/hr) and located in INDIA, 50 km from Chennaï, in a site which covers a 400 ha area, and has to be developed. The factory is self standing with a mechanic unit (for 950,000 u/yr, engine, gearbox), an assembly line, one supplier zone and administrative buildings. |
|||||||||||||
|
|||||||||||||
| Top
of page Return to the "Major projects" page |