Airbus A 380 Assembly Factory at Toulouse - Blagnac (31)
€427M - 350,000 m²

Client: AIRBUS FRANCE - EADS
Architects: CARDETE & HUET - ADPi
Project: Construction of experimentation buildings, assembly, logistics, and tertiary buildings for the industrial assembly and testing of the Airbus A 380
Associated infrastructure works: taxiways, networks
Nature of the assignment: Agent of the prime contractor - General technical prime contracting - Specific prime contracting
Completion deadline: 2001 - 2005
  Architects: CARDETE & HUET - ADPi
   
Emirates Airlines Maintenance Centre in Dubaï
€300M - 300,000 m²

Client: EMIRATES AIRLINES
Architect: ADPi
Nature of the assignment: Design studies for all technical contracts - fluids, construction of the future Emirates Airlines maintenance centre in Dubaï, with a view to hosting the A 380s of the company: 7 maintenance hangars of 10,000 m², 1 paint hangar, workshops (engine, seats and interior equipment, landing gear, avionic survival equipment, etc.), logistics billing, stores, training centre, offices, car park of 3,000 spaces, technical utilities and power complex, mosque
Completion deadline: 2002 - 2005
Delivery of one phase in 2004, after 12 months of work
  Architect: ADPi
   
Tour de contrôle Aéroport Entzheim à Strasbourg (67)
4.200 m² SHO de bâtiment

Client: Direction de l’Aviation Civile Nord-Est - Direction Départementale de l'Équipement du Bas Rhin
Architect: Luc ARSENE-HENRY
Associated architect: Alain TRAUD
Project: Construction of the control tower (height: 35 m) and of the technical center which include all technical and running equipements devoted to air traffic control and airport runways management (3,000,000 Pax)
Nature of the assignment: Services for deconstruction, overall coordination, design and construction engineering
Completion deadline: 2006 - 2009
  Architects: Luc ARSENE-HENRY and Alain TRAUD
   
AIRBUS "All programmes" Delivery Center at Toulouse - Saurous (31)
€25M - 23,750 m² - Car park 550 spaces

Client: AIRBUS FRANCE
Architect: Jacques FERRIER Architect
Project: Construction of buildings and equipment regrouping the functions linked to delivery of planes to clients, for all the models assembled at Toulouse
Nature of the assignment: Use of the documentary and financial modules of e-GID®
Completion deadline: 2005 - 2006
  Architect: Jacques FERRIER
   
Lyon Saint Exupéry Airport at Satolas (69)
Client: CHAMBRE DE COMMERCE ET D'INDUSTRIE DE LYON (CCIL)
Architects: CURTELIN - RICARD - BERGERET and SBT
Project: Extension and redevelopment of Terminal T2
Nature of the assignment: Project management and prime contracting for technical and structural contracts
Completion deadline:

- 1992 - 2000          €38.1M
- 2000 - 2004          €40M
  Architects: CURTELIN - RICARD - BERGERET and SBT
   
Top of page
Return to the "Areas of expertise" page
   
[Accueil] [La société] [Actualités] [Services & missions] [Grands projets] [Domaines d'intervention] [Contacts] [Recrutement] [e-GID] [Groupe Technip]