![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
| Airbus
A 380 Assembly Factory at Toulouse - Blagnac (31) €427M - 350,000 m² Client: AIRBUS FRANCE - EADS Architects: CARDETE & HUET - ADPi Project: Construction of experimentation buildings, assembly, logistics, and tertiary buildings for the industrial assembly and testing of the Airbus A 380 Associated infrastructure works: taxiways, networks Nature of the assignment: Agent of the prime contractor - General technical prime contracting - Specific prime contracting Completion deadline: 2001 - 2005 |
![]() |
|
| Emirates
Airlines Maintenance Centre in Dubaï €300M - 300,000 m² Client: EMIRATES AIRLINES Architect: ADPi Nature of the assignment: Design studies for all technical contracts - fluids, construction of the future Emirates Airlines maintenance centre in Dubaï, with a view to hosting the A 380s of the company: 7 maintenance hangars of 10,000 m², 1 paint hangar, workshops (engine, seats and interior equipment, landing gear, avionic survival equipment, etc.), logistics billing, stores, training centre, offices, car park of 3,000 spaces, technical utilities and power complex, mosque Completion deadline: 2002 - 2005 Delivery of one phase in 2004, after 12 months of work |
![]() |
|
| Tour
de contrôle Aéroport Entzheim à Strasbourg (67) 4.200 m² SHO de bâtiment Client: Direction de l’Aviation Civile Nord-Est - Direction Départementale del'Équipement du Bas Rhin Architect: Luc ARSENE-HENRY Associated architect: Alain TRAUD Project: Construction of the control tower (height: 35 m) and of the technical center which include all technical andrunning equipements devoted to air traffic control andairport runways management (3,000,000 Pax) Nature of the assignment: Services for deconstruction, overall coordination, design and construction engineering Completion deadline: 2006 - 2009 |
![]() |
|
| AIRBUS
"All programmes" Delivery Center at Toulouse - Saurous (31) €25M - 23,750 m² - Car park 550 spaces Client: AIRBUS FRANCE Architect: Jacques FERRIER Architect Project: Construction of buildings and equipment regrouping the functions linked to delivery of planes to clients, for all the models assembled at Toulouse Nature of the assignment: Use of the documentary and financial modules of e-GID® Completion deadline: 2005 - 2006 |
![]() |
|
| Lyon
Saint Exupéry Airport at Satolas (69) Client: CHAMBRE DE COMMERCE ET D'INDUSTRIE DE LYON (CCIL) Architects: CURTELIN - RICARD - BERGERET and SBT Project: Extension and redevelopment of Terminal T2 Nature of the assignment: Project management and prime contracting for technical and structural contracts Completion deadline: - 1992 - 2000 €38.1M - 2000 - 2004 €40M |
![]() |
|
| Top
of page Return to the "Areas of expertise" page |