![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
| SNECMA
Factory at Evry - Corbeil (91) Client: SNECMA ETABLISSEMENT D'EVRY CORBEIL This project is made up of a client assistance assignment as part of the modernisation master plan of the site and prime contracting and assistance to the Prime contractor of the subprojects making up the master plan Nature of assignment n° 1: Time assistance assignment for the drawing up of the site at modernisation master plan: analysis and diagnosis of existing elements, feasibility study, strategic planning, drawing up of calls for tender Completion deadline: November 2005 - March 2006 Nature of the assignments: Assignments as the Prime contractor for the exterior, a workshop of 88,000 m² and a building of 15,000 m²; assignment assisting the Prime contractor for buildings of 3,500 m² and 3,700 m² Completion deadline: 2006 - End 2007 |
![]() |
|
| Quadrilatère
Richelieu -Historical site of the Bibliothèque Nationale de France in Paris
(75) Client: MINISTERE DE LA CULTURE (EMOC) Nature of the assignment: Feasibility study and phasing of safety and rehabilitation works of the Quadrilatère Richelieu, historical site of the Bibliothèque Nationale de France in the centre of Paris (buildings from the 17th to 20th century) Study, estimation, and planning of related transfers and works Completion deadline: 2005 (2 months) |
![]() |
|
| Transfer
of the Versailles Magistrates' Court and the Appeal Court to the site of the old Richaud Hospital in Versailles (78) Client: MINISTERE DE LA JUSTICE (AMOTMJ) Nature of the assignment: Within the framework of the definition study carried out by three teams of Architects and Engineers, Technip TPS carried out a client assistance assignment for the analysis and validation of the technical choices proposed, as well as for fire safety aspects Completion deadline: 2004 |
![]() |
|
| Perspective
for evolution of the Port Edouard Herriot in the Lyon metropolitan area
(69) 107 hectares Client: GRAND LYON/CNR/VNF Urban Architect: François KERN Risk Study: Technip France Nature of the assignment: Assistance to the client for the perspectives for evolution of Port Edouard Herriot in the Lyon metropolitan area; determine the evolution of the poor in terms of economics, logistics, security, and town planning Completion deadline: 2003 |
![]() |
|
| Renewal
of master plans of the Fos Sur Mer Industrial Estate (13) 3,600 hectares Cost of development works: short-term €554M - medium-term €188M - long-term €438M Client: PORT AUTONOME DE MARSEILLE Urban Architect: François KERN Landscaper: ILEX Technical and economical diagnosis of the construction: Technip TPS Nature of the assignment: Assistance to the client for the renewal of master plans of the Port Autonome de Marseille in the metropolitan area, multidisciplinary studies: socio-politico-economical, town planning and technical to determine the evolution of this geographical zone over 20 years Completion deadline: 2002 |
![]() |
|
| Top
of page Return to the "Areas of expertise" page |