Embassy in Warsaw (Poland) €12M - 5,000 m² Client: MINISTERE DES AFFAIRES ETRANGERES Architect: JP PARGADE Nature of the assignment: Full equipment dismantling and asbestos removal followed by restructuration and extension of the building constructed in 1962 by the architect André ZEHRFUSS Full reworking of original facades, total interior refit of the building Assignment of Technip TPS: All building trades engineering, asbestos removal prime contractor Completion deadline: 2000 - 2004 |
![]() |
|
| Nice
City Hall-Town planning reclassification of the Libération-Malaussena quarter
(06) Client: CITY OF NICE Architect: Pierre-Louis FALOCI Nature of the assignment: Prime contractor for the restructuration of a city quarter covering 150 ha, urban redevelopment, construction of the new City Hall and associated administrative buildings for 2,000 municipal agents and elected representatives - Construction of public service buildings: library - media library, art school, sports complex, multimedia area - Underground car park with 1,500 spaces - Shops, interaction with the market area - Coordination with the tramway whose project was being carried out simultaneously and that crosses the urban area dealt with Completion deadline: 2002 - 2007 |
||
| Toulouse
Courthouse (31) €43M - 18,000 m² Client: MINISTRY OF JUSTICE (AMOTMJ) Architects: Pierre & Pascal PRUNET (Paris) Restructuration of existing buildings and extensions Nature of the assignment: Prime contractor for all of the technical contracts and the structural contract, management of works Completion deadline: 1994 - 2006 |
![]() |
|
| Avesnes
Sur Helpe Courthouse (59) €10M - 6,000 m² Client: MINISTRY OF JUSTICE (AMOTMJ) Architect: Pierre-Louis FALOCI Construction of a new courthouse which includes: - A Magistrates' court - A Crown court - A Trade Tribunal - Creation of an underground car park level - Enhancement of the 16th century curtain Nature of the assignment: Prime contractor for structural and technical contracts Completion deadline: 1997 and 2002 - 2005 |
![]() |
|
| Bon
Lait CAZ in Lyon (69) €8.9M - 9,250 m² Client: BOUYGUES IMMOBILIER RHÔNE-ALPES Architect: A.A.B.D. (Dumétier) Project: Construction of "Solaris" modular office buildings Nature of the assignment: Prime contractor for fluids and electricity Completion deadline: 2006 - 2007 |
![]() |
|
| Paris
OPAC (75) €23M - 13,665 m² SHON Client: Paris OPAC Architect: BRULLMANN CROCHON and Associates Project: Office building rehabilitation (former headquarters of the “Le Monde” newspaper) located in the 5th district of Paris, to receive the future Paris OPAC headquarters, in order to gather on a one and only site the all OPAC administrative services Assignment: Technical design and engineering project management, economical and structural, works management Completion lead time: Studies 2005 (12 months) – Works 2006 (16 months) |
![]() |
|
| Conseil
Général of Haute-Savoie in Annecy (74) €10M - 6,100 m² Client: CONSEIL GENERAL DE LA HAUTE-SAVOIE Architect: A.A.M.C.O. Architectures Project: Construction of a building for the Departmental Services of the Conseil Général of Haute-Savoie Assignment of Technip TPS: All building trades engineering - Economics - EXE - SSI - Solar study Completion deadline: 2004 - 2007 |
![]() |
|
| "Le
Gradient" offices - Renault Technocentre in Guyancourt (78) €64M - 46,000 m² Client: RENAULT Architects: D. VALODE & J. PISTRE Nature of the assignment: Project management of technical contracts: environmental engineering, electricity, mechanical appliances, planning and fluids Completion deadline: 1999 - 2002 |
![]() |
|
| Coeur
Défense Property development in Paris (75) 190,000 m² Client: UNIBAIL represented by TANAGRA Architect: Jean-Paul VIGUIER Operation: Construction of a property development with two towers of 39 floors and three buildings linked by a common base Nature of the assignment: Technical assistance: - Assistance with the coordination of works of contract holders - Contract monitoring of implementation of commercial leases - Assistance with management of the perfect completion guarantee - Technical equipment works and interior fittings works (fitness centre, replacement electricity generators) Completion deadline: 2000 - 2001 |
![]() |
|
| Hôtel
du Département of Haute-Loire in Le Puy En Velay (43) €19M - 15,000 m² Client: CONSEIL GENERAL DE HAUTE-LOIRE Architect: J.M. WILMOTTE - GOVERNOR Nature of the assignment: Restructuration and extension of the old hospital, construction from the 16th and 17th centuries, into the building of the Conseil Général of the Haute Loire (offices, Council room, public areas, utilities) All building trades prime contractor (structure, fluids, electricity) and project economics Completion deadline: 1994 -2001 |
![]() |
|
| Headquarters
of the SAPRR and radio studios in Dijon (21) €3.5M - 5,500 m² Client: SOCIETE DES AUTOROUTES PARIS RHIN RHONE (SAPRR) Architect: Michel GINSBURGER Restructuration and extension of the headquarters of SAPRR in Dijon: offices, meeting rooms, depot workshop Construction of studios for Radio Autoroute Info Nature of the assignment: All building trades engineering, project economics Completion deadline: 1997 - 2000 |
![]() |
|
| Quay
Anatole France in Paris (75) €4.8M - 15,000 m² Client: CAISSE DES DEPOTS (CDC) Architect: Christian BIECHER Nature of the assignment: Prime contractor for technical contracts and restructuration of an office block Completion deadline: 1997 - 1998 |
![]() |
|
| "Ruche"
offices - Renault Technocentre in Guyancourt (78) €46.4M - 60,000 m² Client: RENAULT Architects: D. VALODE & J. PISTRE Nature of the assignment: Prime contractor for environmental engineering, electrical engineering, mechanical appliances, and plumbing and fluids contracts - Summary Completion deadline: 1992 - 1997 |
![]() |
|
| Training
centre at Louveciennes (78) €23M - 13,000 m² Client: BANQUE NATIONALE DE PARIS Architect: ADN Nature of the assignment: Prime contractor for special foundations, structures, electrical engineering, and thermal engineering contracts Completion deadline: 1992 |
![]() |
|