![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
| Zénith
Centre and Parc des Expositions in Rouen (76) €20.6M - 31,000 m² Client: DISTRICT DE L'AGGLOMERATION ROUENNAISE Architect: Bernard TSCHUMI Architects Project: Construction of a Zénith–type entertainment centre of 7,000 seats Complete renovation of the Parc des Expositions (24,000 m²) Completion deadline: 1998 - 2001 |
![]() |
|
| Théâtre
National Populaire in Villeurbanne (69) €18M - 7,500 m² Client: VILLE DE VILLEURBANNE Architects: Fabre and Speller (Paris), Arassociati Architects (Milan), S. COVA Scenic artist (Turin) Project: Restructuration and extension of the Théâtre National Populaire in Villeurbanne The operation comprises the rehabilitation of the erected construction, composed of a 700 seat theatre, municipal and associative rooms, the municipal swimming pool, as well as the construction of the new Becker building including a room for 250 people Nature of the assignment: Prime contractor for All Building Trades and economist Completion deadline: Studies in 2005 - 2006 – Works in 2007 - 2010 |
![]() |
|
| Zénith
Centre in Limoges (87) €15M - 9,000 m² Client: LIMOGES METROPOLITAN COUNCIL Architect: Bernard TSCHUMI Architects Project: Construction of a Zénith–type entertainment centre of 6,000 seats Specific concepts: Mixed concrete - steel – wood frame, wooden façade, green car park Nature of the assignment: Prime contractor for technical, structural, and DRC contracts Completion deadline: 2004 - 2006 |
![]() |
|
| European
Centre for Deported Resistance Members in Struthof Natzweiler (67) €10M - 2,500 m² Client: MINISTRY OF DEFENCE Architect: Pierre-Louis FALOCI Project: Construction of the European Centre for Deported Resistance Members on the site of the old Natzweiler - Struthof camp: Reception areas, permanent and temporary exhibition halls as well as works accommodation Mission: Prime contractor for all technical aspects in the design phase and constructio Financial management during the site phase Completion deadline: 1999 - 2005 |
![]() |
|
| Narbonne
Media Library (11) €7.5M - 5,000 m² Client: VILLE DE NARBONNE Architect: BROCHET / LAJUS / PUEYO Nature of the assignment: Prime contractor for structural and technical contracts, project economics of the media library and a car park of 8,000 m² Completion deadline: 1998 - 2004 |
![]() |
|
|
Roanne
Letter Centre (42) €17M - 12,000 m² - Car park 14,000 m² Client: Société d'Equipement du Département de la Loire Architect: Atelier A Project: Construction of an urban leisure centre in the station area of Roanne Construction of a 9-screen cinema multiplex with approximately 1,800 seats, located above the car park Construction of restaurants, shops, and services Construction of a car park of 370 spaces on two levels DRC and development of project surrounds Mission: Engineering All Building Trades Completion deadline: Studies in 2004 - 2005 – Works in 2006 - 2007 |
![]() |
|
| Municipal
Museum in Rochefort (17) €5M - 2,800 m² Client: VILLE DE ROCHEFORT Architect: Pierre-Louis FALOCI Project: Restructuration of the Hôtel Hebre de Saint Clément into a municipal museum Nature of the assignment: Prime contractor for All Building Trades, museum technical contracts Completion deadline: 1999 - 2005 |
![]() |
|
| Rodin
Museum in Paris (75) €5.7M - 3,100 m² Client: MUSEE RODIN Architect: Pierre-Louis FALOCI Nature of the assignment: Prime contractor for All Building Trades for rehabilitation Partial re-use of the museum Restructuration of the chapel Completion deadline: 1997 - 2002 |
![]() |
|
| Top
of page Return to the "Areas of expertise" page |