| Renault
Factory in Sandouville (76) €22M - 15,000 m² Client: RENAULT SA Architects: Technip TPS (pre-design and concept-design phase) and GCC (schematic-design/design development phase and EXE) Project: Extension of the moulding building of the Renault factory in Sandouville: 2 halls of 30 x 125 ml and 26 m Ht, in G+1 Nature of the assignment: Concept-design mission, monitoring the drawing up of the Tender document for a Design-Construction contract CA assignment for partial assignments of DET, OPC, APPROVAL and AOR Completion deadline: 2005 - 2006 |
![]() |
|
| Minatec
TOD Building in Grenoble (38) €15M - 2,000 m² Client: ELYO Architect: Atelier A Nature of the assignment: Construction of a TOD building (Technical Operation Device) of the Minatec centre Property designed for the production and distribution of different "process" energies and fluids Assignment as Prime contractor for all technical building trades and process Completion deadline: 2003 - 2005 |
![]() |
|
| Gas
compression centres in Etrez (01), Chemery (41) and Saint-Martin-de-Crau
(13) Office block in Saint-Clair-sur-Epte (95) €4.8M - 2,000 m² Client: GAZ DE FRANCE – transport management Projects: Construction of pump and compressor buildings, utilities and associated infrastructures, for the compression units of underground storage centres Construction of an associated office block and the making safe of existing buildings Mission: Prime contractor and management of works Completion deadline: 1999 - 2000, 2001 - 2004, 2003 - 2006 and 2005 - 2007 |
![]() |
|
| Test
buildings, Aubevoye Technical Centre (27) €15.2M - 15,000 m² Client: RENAULT SA Architect: Guy SONET Project: Construction and restructuration of several buildings in the Aubevoye test centre Nature of assignments: - Building G12 - G14 - G17: monitoring of works - Building G10 blowers: TCE design and construction - Building G13 - G16: TCE design and construction - Building G18, 19, 20 and 21: Engine tests: Prime contractor Completion deadline: 1993 - 1999 |
![]() |
|
| Vehicle
Test Centre - Renault Technocentre in Guyancourt (78) €16.8M - 18,000 m² Client: RENAULT SA Architect: Jacques FERRIER Project: Construction of offices, workshops, metrology rooms, test benches for all vehicles using innovative fuel (LPG, GNV, hydrogen) Mission: Prime contractor for TCE Completion deadline: 1995 - 1997 |
![]() |
|
| Industrial
warehouses in Montbrison (42) €7.7M - 8,000 m² Client: BICHON Nature of the assignment: "Turnkey" construction of industrial buildings, in several phases, designed for powder paint production, research, and training: - Production and packaging warehouse: 1,800 m² - Storage warehouse: 3,000 m² - Loading quays: 800 m² - Training centre: 1,500 m² Completion deadline: 1995 - 2000 |
![]() |
|
| CETIM
in Saint Etienne (42) €9.2M - 10,000 m² Client: CENTRE D'ETUDES TECHNIQUES DES INDUSTRIES MECANIQUES Architect: M. LASSAGNE Project: Construction of a national mechanical test and experimentation centre including workshops and offices Nature of the assignment: Prime contractor for all technical contracts Completion deadline: 1995 - 1996 |
![]() |
|