Renault Factory in Sandouville (76)
€22M - 15,000 m²

Client: RENAULT SA
Architects: Technip TPS (pre-design and concept-design phase) and GCC (schematic-design/design development phase and EXE)
Project: Extension of the moulding building of the Renault factory in Sandouville: 2 halls of 30 x 125 ml and 26 m Ht, in G+1
Nature of the assignment: Concept-design mission, monitoring the drawing up of the Tender document for a Design-Construction contract
CA assignment for partial assignments of DET, OPC, APPROVAL and AOR
Completion deadline: 2005 - 2006
Architects: TECHNIP TPS and GCC
   
Minatec TOD Building in Grenoble (38)
€15M - 2,000 m²

Client: ELYO
Architect: Atelier A
Nature of the assignment: Construction of a TOD building (Technical Operation Device) of the Minatec centre
Property designed for the production and distribution of different "process" energies and fluids
Assignment as Prime contractor for all technical building trades and process
Completion deadline: 2003 - 2005
  Architect: Atelier A
   
Gas compression centres in Etrez (01), Chemery (41) and Saint-Martin-de-Crau (13)
Office block in Saint-Clair-sur-Epte (95)
€4.8M - 2,000 m²

Client: GAZ DE FRANCE – transport management
Projects: Construction of pump and compressor buildings, utilities and associated infrastructures, for the compression units of underground storage centres
Construction of an associated office block and the making safe of existing buildings
Mission: Prime contractor and management of works
Completion deadline: 1999 - 2000, 2001 - 2004, 2003 - 2006 and 2005 - 2007
 
   
Test buildings, Aubevoye Technical Centre (27)
€15.2M - 15,000 m²

Client: RENAULT SA
Architect: Guy SONET
Project: Construction and restructuration of several buildings in the Aubevoye test centre
Nature of assignments:
- Building G12 - G14 - G17: monitoring of works
- Building G10 blowers: TCE design and construction
- Building G13 - G16: TCE design and construction
- Building G18, 19, 20 and 21: Engine tests: Prime contractor
Completion deadline: 1993 - 1999
  Architect: Guy SONET
   
Vehicle Test Centre - Renault Technocentre in Guyancourt (78)
€16.8M - 18,000 m²

Client: RENAULT SA
Architect: Jacques FERRIER
Project: Construction of offices, workshops, metrology rooms, test benches for all vehicles using innovative fuel (LPG, GNV, hydrogen)
Mission: Prime contractor for TCE
Completion deadline: 1995 - 1997
  Architect: Jacques FERRIER
   
Industrial warehouses in Montbrison (42)
€7.7M - 8,000 m²

Client: BICHON
Nature of the assignment: "Turnkey" construction of industrial buildings, in several phases, designed for powder paint production, research, and training:
- Production and packaging warehouse: 1,800 m²
- Storage warehouse: 3,000 m²
- Loading quays: 800 m²
- Training centre: 1,500 m²
Completion deadline: 1995 - 2000
 
   
CETIM in Saint Etienne (42)
€9.2M - 10,000 m²

Client: CENTRE D'ETUDES TECHNIQUES DES INDUSTRIES MECANIQUES
Architect: M. LASSAGNE
Project: Construction of a national mechanical test and experimentation centre including workshops and offices
Nature of the assignment: Prime contractor for all technical contracts
Completion deadline: 1995 - 1996
  Architect: M. LASSAGNE
   