"Brégaillon" bus depot in La Seyne sur Mer (83)
€17M - 8,100 m² Net Floor Area (buildings) - 31,000 m² (ground)
Client: TPM (Urban community) Toulon Provence Méditerranée
Architect : BBG
Project: Construction of a bus workshop-depot with an operating building located in La Seyne sur Mer
Nature of the assignment: Design and engineering project management of the external works, structure, electricity and fluids works, completed by specific missions (HEQ and CSEP - Classified Settings for the Environment Protection - file)
Completion deadline: 2007 - 2009
  Architect: BBG
   
New City Hall quarter in Nice (06)
€133M
Client: VILLE DE NICE
Architect: Pierre-Louis FALOCI
Project: Creating dynamics in an old quarter by creating a new City Hall (2,000 municipal employees), a high-capacity underground car park (1,500 places), a sports complex and a media library, the rehabilitation of the municipal plastic arts school, the restructuring of roads and the creation of a vast public area, incorporating the route of the first line of the tramway created simultaneously by the Metropolitan Council, and conserving the old Gare du Sud (building dating from the end of the 19th century)
Nature of the assignment: Prime contractor for structural, technical, and DRC contracts
Completion deadline: 2003 - 2008
   
   
Aircraft parking - Air France A380 Maintenance Base at Roissy Charles-de-Gaulle (95)
Phase 1: €3.6M - 31,000 m²
Client: AIR FRANCE SG.TZ
Project: Creation of access to the maintenance hangar and an outside maintenance area with the setting up of nocturnal signals and ground markings
Nature of the assignment: Design, general prime contracting, and OPC
Completion deadline: 2005 - 2007
Phase 2: €1.4M - 20,000 m²
Client: AIR FRANCE SG.TZ
Project: Redevelopment of the existing cleaning area - Enlargement and modification of access in order to enable the passage of the A380, including ground markings
Nature of the assignment: Full prime contracting of works
Completion deadline: 2007 - 2009
 
   
Fitting of the surrounds of the Airbus A 350 final assembly line
on the Toulouse - Saint-Martin site (31)
€4M - Terrain 15 ha
Client: AIRBUS FRANCE
Project: Creation of infrastructures for access to the new building: taxiway and underground networks - Deviation of existing strategic networks
Nature of the assignment: Prime contractor for the entire operation
Completion deadline: 2006
 
   
Underground car park of 450 spaces in Carcassonne (11)
11,000 m² - (estimated to €9.3M)

Client: VILLE DE CARCASSONNE
Architect: Michel TURBINE
Nature of the assignment: Programming for the construction of an underground car park of 450 spaces and the development of a square and the adjoining roads
Assignment: Client assistance
Completion deadline: 2002
  Architect: Michel TURBINE
   
Valmy Area ex-site GIAT in Roanne (42)
Land covering 110,000 m² - Buildings 80,000 m²

Client: GRAND ROANNE
Assignment: DRC prime contractor
Nature of the project: Development of an industrial area Prime contractor for sanitation and drinking water networks, gas, fire, electricity, telecommunications, sewage water removal, rainwater (holding reservoir of 750 m3)
Infrastructures and development of the site
Creation of boulevard Valmy: 2 x 2 carriageways and a two-lane roundabout
Feasibility study and master plan for the creation of an industrial activity park
Date of works: 1999 - 2001
 
   
Renault Technocentre in Guyancourt (78)
Client: RENAULT
Architects: J.B. LACOUDRE and H. FRICOUT
Nature of the assignment: Prime contracting of the surrounds
This assignment covers all of the TECHNOCENTRE site (150 ha)
It includes:
- Prime contracting for the second phase of Infrastructures and Utilities (€200M)
- Coordination/Summary of the plans of all of the prime contractors (excluding building) and the overall management of implantations on the entire site
- Service stations
- Prime contractor for buildings and service station equipment
- Water treatment centre
- Master plan and pre-project of rain water treatment
Completion deadline: 1993 - 1995
  Architects: J.B. LACOUDRE and H. FRICOUT
   
Eurodisneyland Magic Kingdom at Marne-la-Vallée (77)
€91.5M - 108 ha

Client: EURO DISNEYLAND - Magic Kingdom Infrastructure
Nature of the assignment: Prime contractor for infrastructure works covering a surface area of 108 ha (earthworks, networks, roads, production and distribution of energies)
Completion deadline: 1989 - 1992
 
   