The project

The project concerns the processing of asbestos, the making safe, and the rehabilitation of the technical installation building on the Jussieu University Campus, made up of classrooms and research laboratories for geology, chemistry, mathematics, and physics.

Our intervention, within the framework of a vast project that is still in progress, successively dealt with:
- The building of temporary buildings for teachers and researchers during the renovation of the Campus.
- The rehabilitation of a first phase of eight blocks (theory sector) and of the library.
- The removal of asbestos from a second phase of five blocks (geology sector).

The first phase of the operation represents an investment of €65M excluding VAT for the rehabilitation of 60,000 m².

The Client NATIONAL MINISTRY FOR EDUCATION, represented by THE JUSSIEU CAMPUS PUBLIC ESTABLISHMENT
 
Prime contractor   Technip TPS, Engineering contract holder for structure contracts, technical and asbestos removal contracts
Guy AUTRAN and Wladimir MITROFANOFF, Architects
Cabinet CASSO, fire safety expert
GLEEDS international, Economist
 
The assignments of Technip TPS
 
   
Preliminary studies for all of the site:
- Technical analysis of buildings.
- Technical and architectural feasibility studies of the project.
- Fine tuning general scenario for the entire project.
  Prime contracting of the first phase of the operation:
- Pre-project and project studies.
- Consultation of companies and assistance with the signing of works contracts.
- Approval of work execution studies carried out by the companies and management of the study summary cell.
- General organization of the site.
- Management of works.
- Organization and management of approval of works and files concerning work carried out.
- Budgetary monitoring of the site.
   
 
The remarkable aspects of the project

This project had no precedent in France in terms of size and complexity of the asbestos removal and the safety required. It was therefore necessary to firstly establish a thorough diagnosis and technical analysis of the existing buildings, and then define the overall scenario of the project and its budget, before committing to the first operational phase.

The novelty of the project also required an iterative fine-tuning of the programme with users simultaneously with the progress of studies.

Finally media aspects of the operation as well as the numerous town planning and architectural constraints required specific investment in the teams involved, both on the client's side and on the side of the prime contractor and companies.