| The
project The project concerned the redevelopment and the extension of terminal 2 of Lyon Saint-Exupéry airport that had to be carried out whilst ensuring the operational continuity of the site. This therefore required the development of complex phasing of studies and works. Other than increasing the surface areas for the public and doubling the number of check-in counters and boarding gates, a vast basement regrouping all of the main technical equipment was created, mainly working under the existing structure. The main data of the project is as follows: |
The
assignments of Technip TPS
|
|||||
| The
remarkable aspects of the project The essential point is that the project evolved permanently due to commercial imperatives and the continuing operation of the airport. This required the implementation of complex transitory dispositions in order to permanently ensure both the flow of passengers and the multiple energy supplies, and this under rigorous security conditions, for the public as well as for the operational personnel. On a technical level, working partially under the existing structure was a high point of the project. |
|||||
| Top
of the page Return to the "Major projects" page |