The project

The project concerned the redevelopment and the extension of terminal 2 of Lyon Saint-Exupéry airport that had to be carried out whilst ensuring the operational continuity of the site. This therefore required the development of complex phasing of studies and works
.

Other than increasing the surface areas for the public and doubling the number of check-in counters and boarding gates, a vast basement regrouping all of the main technical equipment was created, mainly working under the existing structure.

The main data of the project is as follows:
   
Terminal 2    
- Phase 1: Provisional walkways 1992
- Phase 2: First extension and redevelopment – 10,000 m² 1995 to 1998
- Phase 3: Building creation and subterranean electricity technical rooms and HVAC 1998 to 2000
- Phase 4: Second extension and redevelopment on two levels of departures and arrivals Creation of a bus station – 26,000 m² 2000 to 2003
         
Central Hall Upgrading and renovation of the central building Development of a shopping mall 2003 to 2005
       


Click on image to enlarge
Click on image to enlarge
The overall project represents an investment of €86M excluding VAT.

The Client CHAMBRE DE COMMERCE ET D'INDUSTRIE DE LYON (CCIL)
 
Operational management   DIRECTION DEPARTEMENTALE DE L'EQUIPEMENT DU RHÔNE (DDE 69)
 
Prime contractor   Technip TPS, Contract Holder and structural, technical, and asbestos removal engineering contracts for Terminal 2 and technical engineering for the Central Hall
SBT Europe, CRB Architectes , Architects for Terminal 2
HTVS, Architect for the central building
CHOLLEY MINANGOY, Economist for Terminal 2
VOUTAY, Economist for the Central Hall
CEEF, Engineering and Facades Contract Holder for the Central Hall
 
 
The assignments of Technip TPS

Management of Terminal 2 project:
- Administrative agent.
- General budget and cost control of the project.
- Progress and deadline control of the project.

 
Asbestos removal prime contracting Terminal 2 and Central Hall:
- Organization and procedures.
- Studies.
- Assistance with consulting companies and works contracts.
- Management of the site and assistance with approval of works.
All building trades prime contracting Terminal 2 and Central Hall:
- Survey and diagnosis of existing structure.
- Study of structural and technical contracts.
- Assistance with consulting companies and works contracts.
- Approval of execution studies carried out by companies.
- Management and approval of works.
 
The remarkable aspects of the project

The essential point is that the project evolved permanently due to commercial imperatives and the continuing operation of the airport. This required the implementation of complex transitory dispositions in order to permanently ensure both the flow of passengers and the multiple energy supplies, and this under rigorous security conditions, for the public as well as for the operational personnel.

On a technical level, working partially under the existing structure was a high point of the project.